Skip to the page

Energy

Maintenance software for solar farms

Drop in your inverter list and string schedule: the register comes back in blocks, inverters, combiners and strings, with the plans to keep it running.

Free for one site and up to 3 people. Team: £29 a month for each person who plans, £9 for each who does the work. Everyone who only reports or views is free.

Team opens in Q1 2027. Start free today and move up then.

What comes loaded

  • 26 kinds of equipment
  • 25 planned maintenance tasks
  • 12 checks for the phone
  • 10 duties tracked, each marked to be checked

Each solar farm is laid out as field or array, block, row, inverter station, substation, compound or yard, control building.

  • Inverter station
  • PV inverter
  • Combiner box
  • PV module string
  • PV module
  • Mounting structure
  • Tracker
  • Tracker controller
  • Tracker drive
  • Transformer
  • Switchgear
  • Protection and control panel
  • Substation DC battery and charger
  • Earthing system
  • HV cable circuit
  • Power plant controller
  • SCADA RTU or gateway
  • Weather station
  • CCTV
  • Intruder alarm
  • Perimeter fence
  • Gate or barrier
  • Spares container
  • Access tracks
  • Drainage
  • Vegetation or grazing area

Planned maintenance from day one

The first 10 of 25 starting plans
Task How often Who Where it comes from
Inverter: annual service Every year Specialist Maker’s recommendation: check
Inverter station: six-monthly inspection Every 6 months Your team Maker’s recommendation: check
Combiner box: annual inspection Every year Your team Maker’s recommendation: check
Array: annual thermography Every year Specialist Our library: check
Strings: annual test of a sample Every year Your team Our library: check
Modules: cleaning Every 6 months Specialist Our library
Mounting structure: annual torque and corrosion sample Every year Your team Maker’s recommendation: check
Tracker: six-monthly service Every 6 months Your team Maker’s recommendation: check
Substation: monthly inspection Every month Your team Our library: check
Switchgear and ring main units: annual inspection Every year Specialist Maker’s recommendation: check

Every interval is a starting point. The maker’s manual, the warranty and your own safety rules win, and you change any of them.

Checks on the phone

The forms come loaded. Filling them in on the phone: coming in Q1 2027.

  • String test sheet (IEC 62446-1)
  • Inverter service checklist
  • Combiner box inspection
  • Thermography findings
  • Module damage and return
  • Tracker inspection
  • Cleaning record
  • Post-storm inspection
  • Substation monthly inspection
  • Transformer inspection
  • Site security patrol
  • Vegetation and drainage check

Duties we track in Great Britain so far

The duty rows come loaded. The register of duties with their dates: coming in Q1 2027.

10 duty rows in the pack
Duty Where What it rests on Status
Maintenance of a private HV system under the HV safety rules Great Britain Law: Electricity at Work Regulations 1989, regulation 4(2); Keeping electrical switchgear safe Check
HV safety rules, operating procedures and authorised person appointments Great Britain Law: Electricity at Work Regulations 1989; Keeping electrical switchgear safe Check
Transformer oil sample and dissolved gas analysis Great Britain Law: Electricity at Work Regulations 1989, regulation 4(2) Check
Protection relay testing Great Britain Your contract or consent: The site's connection agreement; Engineering Recommendation G99 Check
Grid connection agreement and G99 obligations Great Britain Your contract or consent: The site's connection agreement; Engineering Recommendation G99 Check
Substation inspection, signs and security where ESQCR applies Great Britain Law: Electricity Safety, Quality and Continuity Regulations 2002 Check
SF6 in switchgear: leak checks, records and recovery Great Britain Law: Fluorinated Greenhouse Gases Regulations 2015 Check
Periodic inspection and test of a grid-connected PV system UK Guidance: Code of Practice for Grid-connected Solar Photovoltaic Systems; Photovoltaic systems: requirements for testing, documentation and maintenance, part 1 Check
Planning and consent conditions UK Law: The site's planning permission or development consent Check
Earthing system resistance test Great Britain Law: Electricity at Work Regulations 1989, regulation 4(2) Check

The legal duties are drafted from the public text each row cites and marked to be checked until a qualified person has reviewed them, in the product as here. Check your own duty-holder advice. Sites in other countries get the same plans and checks; their duty rows are added country by country.

In your words

block, table, string, combiner, MVPS, skid, PR, soiling, clipping, stow, hotspot, bypass diode, I-V curve.

What you watch: performance ratio (temperature-corrected); availability (by the contract’s formula); planned maintenance done on time; inverter availability; strings down; energy lost to soiling; thermography defects open; cleaning cost per MWp.

What is not here yet

  • Permits to work, including HV and DC isolation: coming in Q2 2027.
  • Planned outages and shutdowns: coming in Q4 2027.

Common questions

Do contractors and clients pay?

No. Contractors, clients, requesters and viewers are free, with no limit. You pay for your own staff.

Do we have to keep the starting plans?

No. Every interval and check is a starting point: change it, switch it off or add your own.

Is this legal advice?

No. The duty rows say what the law or guidance they cite asks, and every one is marked to be checked. Check your own duty-holder advice.

More for energy: all energy pages.

Also: Wind farms.

Also: Battery storage.

See it on your own solar farms.

Free for one site, up to 3 people and 2,000 assets. No card.