Skip to the page

Help

What do you want to know?

Short answers, straight from the product. Can’t find yours? Ask at the bottom of the page, or talk to us.

Getting around

today

Today is your front page. Athena puts one thing first, the job in your hands or the most important thing waiting for you, and says why. Below it is everything else that needs you and your jobs by due time.

raise

The Raise button is the one place to raise anything: type or say what is wrong and where, and it is sent as a job or as a request to the desk. You can always change what it suggests before you send it.

raise red tile

The red “Someone is hurt or it’s dangerous” button is always first on the Raise sheet. It shows the emergency number for your country and tells the Owner and Admins at once on the safety lane. Call the emergency number first if anyone is in danger.

raise offline

With no signal you can still raise a job or a request: it is kept on your phone and sent as soon as there is signal. If your words sound like someone is hurt or it is dangerous, you are asked about it again when it arrives.

needs you

Needs you is the one list of things waiting for you: approvals, questions, things to check. It is the same list on Today, in Messages and on the badge. Once anyone deals with an item, it says who did and when.

inbox

Messages has three parts: Needs you, Updates on the records you follow, and Done. Approve, decline or answer from the row itself. Updates can be marked read or archived; safety messages cannot be archived.

search

Search finds work, requests, assets, sites, places and people you are allowed to see. Type a name, a serial, or a number such as WO 1234, wo1234 or just 1234.

guide

Ask Athena how the product works from the box at the top or the foot of the page. Product answers come only from the product’s own help facts; when they do not cover it she says so and passes you to a person.

preferences

Your preferences are your own: language, time zone (your device, a fixed zone, or the site you are looking at), 24-hour clock, first day of the week, theme, text size and what Today shows at the top.

time zones

Times are stored once and shown in the site’s time with its zone; when your own clock differs you see both, such as 09:00 GMT-3 (12:00 your time). A due date is the site’s calendar day.

Your organisation

list

Companies is one list of every outside company you deal with: clients, contractors, suppliers, owners, occupiers, auditors. Each company is on the platform once, whatever it does for you, so a contractor who also supplies parts is one card with two roles.

check

Check a company against Companies House (other countries’ registries later) to tick it as verified. A company that is dissolved or in liquidation shows red.

access

Give a company access by choosing what they are to you (contractor, owner, operator, occupier, auditor) and which sites they work on. They see those sites and nothing else; a contractor sees only the jobs you hand them. Their people never take a seat.

see as them

See as them shows exactly what a company will see, before and after you share, with anything unusual flagged. Every look is recorded with who looked and why.

pause end

Pause shuts a company’s people out at once and keeps everything as it was. End closes their access for good; jobs handed to them close, and the history stays on both sides.

floor

The owner of the assets always sees their sites and the work done on them. That cannot be switched off by whoever hosts the records.

hand job

Hand a job to a company you work with. If they have their own workspace they link it to their own job, so both of you see the same job and its progress without typing it twice; what they say (on site, started, done) appears on your job. You close it.

for others

Work for others lists every client that has let your company in: accept a new one, see the jobs they handed you, link them to your own jobs and tell them when you start and finish. Each client sees only its own jobs.

handover

A custody handover passes a site, an asset or a job to another company’s workspace when a contract changes hands. Both Owners sign, and each side keeps the same record with the same fingerprint. Your private notes and rates never travel.

offline

People from another company can work offline too: their phone keeps only what their company’s access shows, and nothing else of yours.

Sites and places

what is a site

A site is a place with its own address or coordinates. Everything else (buildings, floors, rooms, zones) sits inside a site.

bare first

A site can exist with a name alone. Add the address, who to call and how to get in when you have them.

codes

Site codes are numbered SITE-001, SITE-002 unless you type your own. Codes are labels: renaming or recoding a site never breaks anything.

kinds

Which kinds of place may sit inside which comes from the sector template (a floor goes inside a building, a room inside a floor). Admins can change the list.

add many

Type "G01 to G24" or paste a list, one name per line, to add many places at once. Ranges keep their zero padding.

rename children

Renaming a place can also rename inside everything under it: "Block B" to "Block C" turns "Block B Floor 1" into "Block C Floor 1".

move

Moving a place takes everything under it along, assets included. A place can never be moved inside itself, and the kind rules still apply.

demolished

Marking a place demolished needs its assets moved or retired first. The place stays in history; nothing is deleted.

archive

Archiving a site is blocked while assets still live there. Only a person can archive a site; Athena never does.

access

Access information is directions, parking, hours, windows, entrances and locking up. Confirm it is still correct with one tap; it turns amber after six months.

contacts

Who to call is ordered within each role: first call, second call, escalation. Mark a contact verified when you have checked the number.

here

"I'm here" records your arrival with the phone's position as evidence. It never unlocks anything by itself.

templates

Sector templates (office, factory, battery storage, solar, wind, water works, housing, hospital, school, depot, hotel, store, warehouse) bring the kinds of place and the contact roles that sector uses.

builder

Describe a site in a sentence or drop in a spreadsheet and Athena drafts the tree of places. Nothing is written until you tick Create.

rules pack

Each site follows its own country’s rules: the regulator, what things are called, the money and the date style. A US site and a UK site in the same account each show their own.

rules regional

Where a state, province or nation has its own rules (California, Ontario, New South Wales, Northern Ireland), they are laid over the country’s and named on the site.

rules check

Every rule is marked “check” until a qualified person in that country has reviewed it. Athena proposes; a person decides and sends anything to a regulator.

rules version

Choosing a site’s rules keeps it on that version. A newer release changes nothing until you move the site onto it; a record keeps the version it was judged under.

establishment

In the United States an injury log is kept per establishment. Make an establishment and put its sites into it; a site on its own is its own establishment.

homes

Each home keeps its profile: UPRN, tenure, construction, build year, bedrooms, heating and fuel, EPC band, and its status with the date it changed (occupied, void, decanted, sold). The list shows how much of each home’s data is known, so the gaps are plain.

served by

Link a home to the communal boiler, lift, door entry or water supply that serves it, so a fault on that equipment shows every home affected.

vulnerable flag

A home can be marked as having a vulnerable occupant. Only people your workspace allows see the mark; a contractor never does. Repairs for a home with the mark are raised sooner where heating or hot water is lost.

access codes

Gate, alarm, key safe and door codes are kept sealed. A code shows for 60 seconds to someone allowed to see it, after they say why; every reveal is recorded with who and when. Changing a code keeps the old one in the history and tells the people with work there that it changed, never the code itself.

access codes today

A code can be kept for people with a job at the site today: it shows only to someone assigned work there from yesterday to tomorrow.

access codes on phone

For your own job at a site today, Keep on this phone holds a code for when there is no signal at the door. It is locked to that one phone, so it cannot be read anywhere else, and it is wiped at midnight or when the job closes. Showing it still asks why, and is recorded with who and when as soon as the phone is back online.

risk markers

A risk marker warns staff about a place or a contact: a dog, sharps, aggression in the past. Everyone sees only the caution line, such as “two-person visit”; the detail shows to the safety lead and people they name, after a reason, and every look is recorded. A marker is reviewed within 12 months or it stops showing.

plans

Upload a floor plan or site plan, set its scale from two points and a distance, and pin equipment, places, jobs and assembly points on it. A new version of the drawing keeps the pins where they were.

map

Draw a site’s boundary, zones, geofences, hazard areas, overhead lines and buried services on its map, and see the places with coordinates.

routes

A route is a road, rail line, pipeline, cable or main found by its measure along it rather than by room. Each route keeps its own unit: metres, kilometres, miles and chains, miles and yards, or kilometre posts.

route markers

Markers are the mileposts, chainage boards, manholes, poles and joint bays along a route, each at its measure. A marker whose coordinates do not match its measure shows how far out it is.

route jumps

Where a route’s measure jumps or overlaps, add a measure jump: “at 12m 40ch it restarts at 12m 00ch”. Every measure on the route is then worked out across it.

route locate

Where am I on the route turns your position, or words such as “23m 40ch down side” or “50 m past MH 2041”, into a measure, a side and the nearest marker. It works on the phone with no signal from the route copied there, and says how sure it is: more than 50 m from the line is marked low.

networks

A network is water, sewer, heat, gas, cable or fibre: nodes such as valves, hydrants and chambers, joined by segments with their size, material and how many properties each one serves.

network isolate

Isolate shows which valves to shut to take a segment out of supply, the valve to shut instead where one is known not to turn or has never been tried, how many properties lose supply, and priority customers such as hospitals and schools as counts, never names. The discolouration risk is marked check: confirm it with your own network modelling.

valves

A valve keeps its normal state and its state now. Opening, closing or throttling one is recorded by the person on site, with the time and the job; a valve found not to turn is recorded as such and keeps its state. Athena never records a valve operation.

Equipment

what is an asset

An asset is anything you maintain: a boiler, a lift, a pump, a door. It always has a place (where it is) and a class (what kind of thing it is).

numbers

Asset numbers are minted on the server, A-00001 upwards, and never reused. Old numbers from another system are kept as aliases and still find the asset.

classes

Classes come from the library (boilers, AHUs, fire alarms, inverters...) with their usual words as synonyms. Adopt the ones you use; make your own when none fits.

provisional class

A class Athena chose is provisional until a person confirms it. The compliance pages say when duties may be missing because of that.

duplicates

Before an asset is saved, the same serial, the same old number or the same name at the same place is flagged. Open the existing one, or save anyway with a reason.

hierarchy

An asset can be part of another (a motor in a pump, a pump in a plant). Moving an asset takes its parts with it. An asset can never sit inside itself or under a retired asset.

retire

Retiring an asset keeps its history. Choose what happens to the parts under it: retire them too or move them up. Only a person can retire or dispose; Athena never does.

import

Drop in a CSV, Excel or JSON file. Columns are matched to fields by their headers, dates and numbers are read in any common form, and nothing is written until you press Run. A dry run shows what would happen.

read the plate

Photograph the rating plate and press Read the plate. Athena reads it twice with two models and shows maker, model, serial, year and ratings, each marked clear or check. Nothing goes on the asset until you tick what to use; anything you type over counts as typed.

read the plate limits

A value the plate does not show is left blank, never guessed; characters the two reads disagree on show as ?. Writing on a photo that tries to give instructions is never followed: the reading is flagged and waits for a person. AI work is priced in credits.

import matching

An import matches rows to existing assets by serial, then old number, then number, then the same name at the same place. Existing values are kept unless you choose Replace.

import undo

An import can be undone for seven days: assets it created are removed, values it changed go back.

labels

Every sticker carries a random code and opens predictandmaintain.com/q/<code>. Print pre-printed batches and bind them on a walk-round, or print one per asset.

label lost

A lost label still resolves, with a note that it was lost, so an old photo of it still works. A replacement code is minted for the same asset.

public landing

Anyone who scans a label sees what you choose: the name, where it is, its status, and a Report a problem button. Never people’s names or costs.

export

Export the register or one site as CSV, Excel or JSON with every column, custom attributes and the hierarchy as a path. Your data is always yours to take.

bulk edit

Change many assets at once (class, place, criticality, condition, find and replace in names). Every change is kept and can be undone for seven days.

criticality

Criticality scores five things from 1 to 5: safety, keeping things running, the law and insurance, cost if it fails, and environment. The worst one decides the band, so one serious consequence makes a thing critical.

criticality assessor

Athena drafts a criticality for equipment that has none, from its kind and its own records. A person checks each draft; nothing counts until they approve it, and she never changes one a person set.

condition

Record a condition from A (as new) to E (very poor). It sets how much life is left and the year to replace it, which the capital plan reads. D brings replacement within two years; E means now.

duplicates

Each night the register is checked for two records that are one thing: the same serial, or the same name at the same place. Merge them and everything on the duplicate (jobs, warranties, labels, requests, documents, what sits under it) moves to the one you keep. Undo puts it all back for 30 days.

catalogue

The make and model catalogue holds each maker and model once, with its expected life. Fill it from the register links every asset that names the same maker and model.

register health

Register Health lists what is missing or wrong in the register each night: classes not confirmed, no criticality, no condition, no install date, critical equipment in poor condition, possible duplicates, no label. Each line says what to do.

Requests

what is a request

A request is anything someone asks the maintenance team for, from any channel, before it becomes work. Each has a reference such as R-12 that is short enough to read over the phone.

channels

Requests come in from the report form on your public link and on every site’s own link, from the Report a problem button on equipment labels, from your inbound email address, and from the desk raising one for a caller.

hazard floor

Before anything else reads a request, fixed hazard rules set a minimum priority from the words: a smell of gas, sparks, smoke, someone stuck in a lift and the rows of your sector. Nothing, including Athena, can set it lower; only a desk lead can, with a typed reason.

priorities

Priorities are Emergency, Urgent, Routine and Planned. With no hazard and no answer to “Can you carry on?”, a request is Routine.

sla

Every request gets a respond time and a fix time from one rule, counted from when it arrived: Emergency 30 minutes and 4 hours, Urgent 2 hours and 1 day, Routine 8 hours and 5 days, Planned 2 days and 4 weeks. The work made from it is due at the same fix time.

untriaged

A request nobody has looked at yet sits in Untriaged. After 15 minutes (2 minutes when a hazard rule matched) the alarm goes to the desk owner, or to the workspace Owner when none is set. It works when the AI is down.

draft

Athena reads each new request and drafts the work order for it: title, trade, priority, asset and tasks, each with its reason. It never makes the work itself; you check the draft, change anything, and press Make this work. What you change is kept so the next draft is better.

status link

Every requester gets a private status link. It shows the reference, where things are and when to expect a fix, never names or contact details. It can be replaced at any time, which stops the old one working.

email

Email your inbound address and the message becomes a request with an acknowledgement. Replies keep the reference in the subject and join the same request. Out-of-office replies, bounces and mail loops are logged and never answered.

public safety

On a public link or a label, people say what they are reporting: something broken, something unsafe, a near miss or someone hurt. The last three go straight into the safety register as a safety report and the safety lead is told; so does “something broken” when the words sound like someone hurt or danger and the person did not say no.

public languages

The report page and every update to the requester are in their own language when we hold it: English, Welsh, Spanish, Polish, Portuguese, French or German. Updates are fixed lines, never written by Athena.

updates

Athena tells each requester, in their language, when their report is looked at, when work is booked, when it is done and when it is closed, one line at a time and once each. A line by email waits two minutes before it goes. Spam and reports the person cancelled get nothing.

duplicates

The same thing reported again from the same equipment within a week joins the first report: the person is told and gets its updates. A safety report, or one that sounds more serious, is never joined without a person.

reception

Every five minutes Athena reads the new reports from your links, labels and inbox, and marks the ones that read like spam, look like a report already open, sound dangerous, or are in another language. Nothing changes until someone accepts the reading.

public link controls

Each site’s link can be paused, given an hourly limit, or set to need a checked email (a code by email before the report goes). Labels stay open. Too many reports from one place, or bots, are stopped before they become requests.

photos

People can add up to three photos to a report from the public page, up to 8 MB each. Location and camera details are taken out of the copy that is kept.

follow up

From their status link a requester can add information at any time, or cancel their report before work starts with a code sent to the email on it. A safety report, or one reported as dangerous, cannot be cancelled from the link.

portal

Requesters sign in to the portal with the email or mobile number they gave you and a code we send them. They see only their own requests and complaints: where each one is, what happens next and when, and the messages to and from them. They can report something new, add to a request, ask to talk to a person, or make a complaint.

texts

People can report by text or WhatsApp to your number. A new message starts a request and gets its reference back; a reply joins their open request. PERSON asks for a call back, STOP stops our messages and START puts them back. What they write is kept as they wrote it.

promise policies

Promise policies set how fast you respond and fix, per priority and per site, on a round-the-clock or working-hours clock. Working hours run on each site’s own time and skip its public holidays. Every time you give a requester a time, it is kept as a promise and marked kept or broken.

on the way

When someone sets off, tap On the way: the requester gets a text with their first name and an arrival window. Tap Arrived when you get there; the window is marked kept or broken.

complaints

A complaint is recorded on its own, with a date to acknowledge it and a date to respond, counted in working days at the site. A named person handles it. More time needs a reason, and the complainant is told before the first date passes. Stage 2 is reviewed by someone other than the stage 1 handler. Only a person closes a complaint, and only after a response.

housing clocks

At a housing estate, a report of damp and mould, no heating or no hot water starts the clocks the law and your pack set: in social homes in England, an investigation within the working days the law gives and an emergency made safe within 24 hours. They show on the request with their legal basis, run on working days at the home’s own holidays, and cannot be paused.

vulnerable

When the home has a vulnerable occupant, losing heating or hot water is raised to an emergency and the no-heating clock is shorter. Only people your workspace allows see why; a contractor sees the priority, never the reason.

Jobs

what is a work order

A work order is one piece of maintenance work, from the moment someone raises it to the moment the record of it is sealed. Corrective, preventive and inspection work are all work orders, each with its kind.

numbers

Numbers are minted on the server per kind and year: WO-CM-26-00001 for corrective work, WO-PM-… preventive, WO-IN-… inspection. A job raised with no signal shows a pending number until the phone syncs.

raise

Raise work with one line of text and a place. An asset is optional: work on the site or a room is site-level work. Pick a template to get its task list.

statuses

A work order is draft, open, scheduled, in progress, on hold, completed, closed or cancelled. Completed means the person who did it says it is done; closed means it was accepted and sealed.

stations

On the phone a job is one screen of stations in the order work happens: Brief, Start, Tasks, Parts, Close-out, Sign-off, Finish. A quick fix shows only Start, Tasks and Done.

arrival

Arrival is recorded in one place only, the job’s Start station. Tapping “I’m here” twice does nothing the second time.

pass all remaining

“Pass all remaining” ticks every task left after showing how many. Safety-critical tasks and readings are never passed in bulk; they are done one at a time.

readings

A reading outside its limits asks you to fail the task or add a note saying what you did. A zero is a reading.

complete guards

Complete checks the job first: every required task done or marked N/A with a reason, every reading in, the photos the tasks ask for, and a summary when there were no tasks. Anything missing is named.

evidence uploading

You can complete a job while photos are still uploading. It shows “completed, evidence uploading” and is sealed when the last photo arrives.

who closes

Completed work is closed by a reviewer, or by the person who did it when the setting says so or nobody else can review. A one-person business’s job ends Done.

sealed

A closed work order is sealed with a SHA-256 audit identifier over everything recorded on it. The report recomputes it every time and says if anything changed.

corrections

A sealed record is never edited. A correction keeps the old value, the new one, who, when and why, and writes a new identifier. Reopen puts the job back in progress.

late evidence

A photo that reaches the server after the job was completed or sealed is never refused: it is added as dated late evidence with its own identifier.

hours

Hours are recorded from the timer, typed, or proposed from arrival to departure for you to confirm. They are hands-on hours; pay and cost are elsewhere.

templates

Templates hold a job plan: tasks, readings and limits, the station profile and the estimated time. Adopt your sector’s starter set, make your own, or save a finished job as one.

review

Completed work waits on Review. Each job says Clean, Needs a look, or Safety: human close with the reason. Close all clean never includes a safety job.

safety human close

A person always closes: work on a safety-critical asset or a fire, gas, lift, pressure or other life-safety system; work with a permit or isolation; a linked safety action; a failed check or a reading outside its limits; statutory work; a disputed job; an uncoded repair where coding is required; and a job sent back before. No rule can change that.

auto close

Athena closes a clean job by herself only under a rule your organisation wrote, and never safety work. The record says “Closed by Athena” and the rule. A reviewer can unseal it within 30 days.

send back

Send back returns a completed job to in progress with your note pinned on it. The technician signs again when it is done again.

failure coding

On a repair you say what failed and why. You are asked, not made, unless an Admin makes it required (or required for teams of more than three). “Not sure” always completes.

ai draft

Athena drafts the close-out from what you recorded. Accept as written and it shows “AI draft, check it” until someone edits it.

merge

Merge folds a duplicate repair into the job it repeats. Nothing is lost: the duplicate keeps its records and shows Merged, its requests follow the job that stays, and Unmerge puts it back.

search

Search finds work by number however you type it (123, CM 123, WO-CM-26-00123), by label, by words and the other words people use for them, and through small misspellings.

template versions

Changing a template makes its next version. Work already raised keeps the version it was raised from; after Publish you can update open work nobody has started.

repeat this

Repeat this makes a planned maintenance plan from a job: the same tasks or template, on the same equipment, every so many days, weeks, months or years.

cannot get in

Can’t get in, or can’t go on, on the job: say what happened (no access, cancelled at the door, refused entry, not safe, parts, weather). No access needs proof: a card left, a call made or a photo of the door. Each visit that ends at the door counts as an attempt, and the planner books it again for another time of day.

not finished

Not finished today: say how long is left and what the next visit needs. Only what is left is planned again, and the job keeps a summary for each visit.

follow up

Follow-up work offered at close-out is raised with one press as a new job linked to this one, or marked Not needed with why. A follow-up is never raised twice: if the same work is already open on the asset, add to that job instead.

callout

A callout is reactive work out of hours: when the call came in, when someone must be on site by, who accepted it and when they arrived are all on the job. Accept it, leave home and tap I’m here, or fix it on the phone. A callout becomes a repair with Convert kind and keeps its number.

first fix

Fixed first time is worked out when the job is completed: one visit on site (or none, fixed on the phone), no visit that ended short and no follow-on job. A callout that needs a return visit raises follow-on work from the close-out.

customer signoff

Customer sign-off on the phone: hand it over and the customer sees the report of the job, types their name and accepts, declines with why, or asks a question. What they sign is fixed to what they saw: if the job changes while the screen is open, they are asked to look again. A signature is never changed afterwards.

sign link

Send for sign-off sends a one-time link to the customer’s copy of the report, by email, text or WhatsApp, to one of the contacts on the job’s site; or make a link to copy and send it yourself. It works once, runs out after 14 days unless your organisation sets another time, and a newer link replaces it. The customer needs no account. The job keeps only a fingerprint of the link, never the link itself.

job report

The job report has your organisation’s name, your accent and your own words at the top and the end. The customer’s copy shows what was done, the parts, extra work that was agreed, photos and who signed; never your internal brief, hours or costs. Your own copy adds hours, and costs for people who may see them.

extra work

Extra work found on site is asked for on the job with what and why, a price and photos if there are any, and is agreed or turned down before it is done, with who agreed, as who and how (in person, on the phone, in writing). A job cannot be completed while extra work is waiting for an answer.

costs

Costs on a job: hours at your own labour rate per rate (normal, overtime, callout, travel, standby) or for one person, parts at their cost when they come from stock, and contractor and other costs typed in. They are posted when the job is completed. A cost that is not known yet is shown as not known, never as nothing.

costs tab

A job’s Parts and costs shows what was expected beside what it cost, by labour, parts, contractors and other costs. A cost with no price yet is counted, never shown as nothing, so the actual reads “at least”.

costs ledger

Post to the ledger puts the job’s priced costs into the money ledger once each; a cost removed afterwards is taken off by a reversing line that names it, never by deleting. Budgets, projects and outages all read the same ledger.

estimate

The estimate is a person’s: save the lines you expect by kind. Saving again replaces the earlier lines and keeps them in the history.

procedures

A procedure (standard, emergency or a method of procedure for a change on live plant) is a list of steps with what to expect. A version is approved by someone who did not write it and is frozen; a change is a new version.

mop

A method of procedure cannot start until a second person has approved the change it makes. A step that takes a path away asks you to confirm the other path is carrying the load. A reading outside its range holds the run until a person releases it or backs out.

procedure verify

A step with a verifier is checked by a different person, who reads back what they see. If the words do not match, the step is not verified.

expenses

Claim an expense on the job with its receipt photographed (travel time and mileage need none). Someone who did not claim it approves it; it then shows as a cost on the job and goes on the ledger with the rest.

grade

Grade the work from 1 to 5 once it is done. When your organisation sets a minimum grade, a job below it is left off the monthly invoices until it is graded again, and the invoice draft says how many were held back.

workmanship warranty

A job can carry a workmanship warranty for a number of days. A repeat job on the same equipment inside it can be raised as a callback: not chargeable unless a person decides it is not a callback. The one who did the work may contest it with why.

plant change

A change to plant or process is raised by one person and approved by another. A job tagged as a modification under a change cannot start until that change is approved.

Planning

one page

The plan is one page with views: Week (who has what each day against their hours), Backlog (everything waiting), Board (people down the side, days across) and Calendar. Each view has its own address, so a bookmark opens where you left it.

by hand

Plan by hand any time: pick a job, pick a person or a crew and a day, and it goes on their day. Athena also plans next week for you to approve; nothing she proposes skips the checks below.

checks

Every placement is checked: does the person hold the skills that trade’s work needs, are they working that day and is there room in their hours, and is the site closed. A failed check is shown beside the job as a warning; it does not stop you.

hours

Each person’s hours come from their shift pattern, less breaks and absences, times the share of a shift free for planned work. A job with no estimate is planned for an hour unless the backlog says otherwise.

rows

A job can be on several people’s days, or spread over several days: each part is its own row, so moving one person’s part never moves anyone else’s.

backlog

The backlog is every open job not yet on the plan, highest score first, then the earliest due. Set a score with a reason, pin a priority until a date, defer a job to a date, or set its estimate by hand.

bulk

Pick many jobs and the people to do them and they are spread over the coming days in one go: each job goes on the first day with room for it, to whoever has most hours left. Jobs that fit nowhere are listed with why.

moves

Drag a job to another day or person and it keeps its length. If someone else moved it a moment before, yours is refused with their name, so two planners never overwrite each other. Once the person has set off, the job stays where it is.

undo

Every change to the plan is kept: who, when, before and after, and why. The latest change to a job can be undone, which is itself kept as a change. A job taken off the plan stays visible as taken off, with the reason.

my day

My day shows each person their stops in order with one button at a time: Start travel, Arrived, Start work, then Next stop. The plan sees each step as it happens.

offline

A person’s jobs and their stops travel with them on the phone, so My day opens and the steps can be pressed with no signal; they are sent when the phone is back online, with the time they were pressed.

nobody

A job raised by someone who does jobs is theirs. A job raised by anyone else waits with nobody on it, and planners see “1 job has nobody: assign” until someone does.

closed days

Closed days come from one calendar for the whole product: public holidays, site closures and days closed every week. Planned maintenance moves its visits off them; the plan warns when a job is put on one.

export

The week can be printed, or saved as a spreadsheet with every job, person, day and start time.

job plans

Bigger jobs get a job plan before they go on anyone’s day: the steps, who is needed by skill and for how long, the permits and the documents. Job plans is under the plan and on Build; every job shows how far its plan has got and when it should be ready by.

simple jobs

Small jobs skip the job plan: anything made from a template, planned work that came with its checklist, and work shorter than your organisation’s limit (two hours unless you change it). A planner can also mark any job simple, or send it back to planning.

athena drafts

Ask Athena to draft it and she writes the job plan from the template, from jobs like it and the hours they really took, or from the job’s own tasks; only when there is nothing to go on does she write it from the job’s words. Every line says where it came from. Nothing in a draft counts until a person uses it.

athena never

Athena never marks a job plan planned: a person does. She names a permit only when a task, a template or a job like it says one is needed, and a permit is always issued by a person on the day. If the job mentions something like hot work and nothing names the permit, she says someone should look first.

readiness

Each open job shows whether it is ready: its job plan, access to the site on the day, the skills of the people on it, parts still to order, permits and documents. A closed site or an expired skill says not ready; the rest say check. Not ready never stops anyone placing a job by hand: the plan shows why beside it.

groomed backlog

Athena scores each job waiting to be planned and says why: the priority asked for, how near the due date is, the equipment’s criticality and safety, statutory work, repeat faults and how long it has waited. A score, pin or estimate a person sets always wins; she never changes a priority, she only marks one that looks too high.

week proposed

Every Thursday at 14:00 (you can change the day and time) Athena plans next week: who does which job on which day, within everyone’s hours and skills, statutory work first, with the reason on every line. Nothing goes on anyone’s day until you press Approve the week.

week change line

Before you approve, change any line: give it to someone else, move it to another day, or leave it for later. What Athena proposed stays beside your change, and the same checks as placing by hand are shown.

week to decide

What Athena cannot settle on her own is a thing to decide: nobody with the skills is free, a statutory job is at risk of its date, there are not enough hours, a job is longer than anyone’s day, or it is not ready. Each comes with the options she found; approve the week and those jobs stay in the backlog until you decide.

week never default

A week is never approved for you. If nobody has approved it by Friday 16:00 (you can change it), the admins are asked too. If the week begins and nobody has, it stops waiting and the last approved plan stands.

capacity ledger

Everyone’s time is kept in one ledger: their shift less breaks and absences, less the work already on their day and anything else that has booked them. Athena never books someone past their free time; if anything would, it shows as one thing to decide instead of two bookings.

week phone

On your phone, Approvals shows the week waiting for you as one card: the jobs, each with its WO number, who and which day. Tap a line to change it, then Approve the week.

day order

Before each day is sent, Athena puts it in order: stops already under way first, a promised time kept, the most pressing next, then the nearest next with jobs at the same site together. Each stop gets its travel time and an arrival window. She never changes who does a stop, and Undo puts the order back.

day brief

Each stop on a day gets three lines: what it is (with its WO number), why, and what to watch for: permits, parts to take, tools, access, documents to read, and what the last visit said. Every line comes from the job’s own records. A permit line is shown word for word: a person issues the permit on the day, and work does not start without it.

day send

Each person’s next day goes to their phone at the send time on the working day before (four in the afternoon unless you change it), so a Monday goes on Friday. They tap Got it; if they have not by eight on the day, the dispatcher sees it on Team today.

day safety

A day with safety work in it (a permit, an isolation, an emergency) is never sent by Athena on her own: a supervisor says yes, and it goes on the safety lane, which quiet hours never hold. If nobody taps Got it they are reminded, then their manager is told.

day hold

A day is never sent while one of its stops is blocked (the site is closed that day, a skill has run out). It is held back with the reason on Team today until someone fixes it or takes the stop off; warnings alone never stop a day going.

my week

My week shows your next seven days: how many stops, when the first starts, and whether each day has been sent and acknowledged. Tap a day to see its stops.

team today

Team today shows a supervisor each person’s day: sent or not, Got it or not (and how late), where they are now and what is next, each with its WO number. Days held back say why.

move up down

On My day, Move up and Move down change the order of your stops at once, unless that would break a promised time or make a job late: then it says why, and Ask the dispatcher sends your request to the planner.

athena reorders

When your day stops working (a job runs over a promised time, a job is added), Athena puts the rest in a new order. Between jobs it just happens and you can Undo it; while you are on the way or on a job she shows it at your next stop and you say yes or no. She never moves your stops to someone else.

not well

I’m not well, on My day, tells your supervisor at once. Athena asks a planner, once, to hand the rest of your day to people who hold the skills and have the time; nothing moves until they say yes. Make safe anything you have started.

cant do this

Can’t do this takes a stop off your day with your reason on it, and the planner is asked who should do it instead. Once you have started a job, finish the visit on the job instead: Can’t get in, or Not yet with the time left.

moving between people

Moving work from one person to another always needs a person’s yes. Safety work only goes to someone who holds everything it needs, and their day is sent again on the safety lane with a supervisor’s yes.

end of day

From half an hour before the last shift ends, Team today shows the end of the day: what was not started, what is still under way, what could not go ahead and who is still out. At the end of the shift the day closes on each site’s own clock: work not started is carried over, the time left after a visit is carried once, and the hand-over note is written. Nothing is closed or completed for anyone.

carry over

Work carried over goes back on the plan ahead of new work, with a suggestion: the same person on their next working day if they have room. Place as suggested puts it there; Open the day again puts everything back.

Planned maintenance

plan

A plan says what routine work an asset gets and how often: “every 3 months”, or once on a date. Write it once and put it on as many assets as it suits.

versions

Changing a plan makes a new version with your reason. The version in use keeps running until you activate the new one, and work orders already made keep the version they were made under.

fixed floating

Floating counts the next visit from the day the last one was done; fixed keeps to the calendar whatever happens. A late visit pushes a floating plan on and leaves a fixed one where it was.

window

Each visit has a window around its due date, a share of how often it is done (10% each side unless you change it, at least a day and at most 30). Done by the window’s last day counts as on time.

lead time

The work order appears a set number of days before the visit is due: 14 unless the plan says otherwise. That is when it reaches the planner and the board.

never twice

Each visit can be made once only. Running the Generator again, or two of them at once, finds the visit already there and makes nothing more.

nightly

The Generator runs every night at 02:00 at each site’s own time, and again within a minute of a plan being activated, put on assets or changed, or a closed day being added. Every run is in the run log with what it made.

closed days

Closed days come from one calendar for the whole product: public holidays, site closures and days closed every week. A visit due on one moves to the next open day, or the one before if the row says so. Work orders already made are not moved; they show that they now fall on a closed day.

holidays

Public holidays can be added in one go from the built-in table for England and Wales, Scotland, Northern Ireland, Ireland or the United States. Each one is marked to check until someone confirms it for the year.

overrides

One asset can be done differently: another interval or a new next due date, with a reason and an optional end. The plan itself stays as it is.

suspend

Suspend a plan, or one asset’s plan, with a reason while the asset is out of use. On resume, keep the calendar or count again from today. Nothing missed while suspended is made afterwards.

skip

Skip a visit with a reason before its work starts. Some reasons leave the compliance figure (the asset was out of service); others count against it (no access). Athena never skips a visit by itself.

compliance

PM compliance is the share of visits due that were done by the last day of their window. Late work still closes the job but counts against the figure. With nothing due yet it shows a dash, not 0%.

plan builder

New plan has three ways in: describe it in your own words and Athena drafts it, pick a ready-made plan from the library, or fill it in yourself. Every way ends in a draft; nothing makes work until you approve it.

plan builder sources

Each step of a drafted plan says where it comes from: the library, your maker’s manual, your own words, or “No source: check it”. A plan is never drafted longer than the strictest source it uses.

patterns

Besides “every 3 months”, a plan can run on chosen days of the week, a set weekday each month (the first Tuesday), the last working day of the month, or every few hours from a set time, which keeps its times through the clock changes.

previous open

If the last visit is still open when the next falls due, the plan can make the next one anyway, skip it and say why (it does not count against compliance), or add it to the open job.

downtime

A plan can say it needs the plant stopped, for how long, and whether operations must release it first. The work order says so too.

grouping

Tick “Visits due together at a site share one work order” and the visits due in the same window at one site come as one job, with a part for each asset.

schedule import

Bring the schedule you keep now (Excel or CSV): each task becomes a draft plan on the equipment it names, next due from when it was last done. Overdue ones are said, and their first work order comes as soon as you approve them.

maker items

Your makers’ recommendations (from their manuals) are kept per make and model, with where the manual says so. Athena uses them when she drafts a plan for that equipment.

overdue

The overdue queue lists every planned visit past its window, and those about to miss it with nobody planned. Legal duties come first, then safety-critical equipment, then the most critical, then the longest late. Every row shows its work order number.

overdue athena

Athena proposes one decision a row: escalate it to the compliance lead, chase whoever has it, skip it when the equipment is retired, or plan it. Nothing happens until you press it. A legal duty or safety-critical equipment is decided one by one, never in “Apply Athena’s proposals”, and never skipped here.

legal duty

A plan built from a library row that a law usually sets (a lift or hoist thorough examination, a gas safety check, an EICR) shows “Legal duty (basis unverified)” until someone marks it statutory with its legal basis. It is ranked first and escalated when it is overdue.

year view

The year view shows every plan week by week: visits done, made and forecast, the hours each week takes against the hours you have, and closed weeks. The line under the title says if it is balanced, or which month is over and by how much.

level

“Level the programme” has Athena propose new dates for visits not made yet, each inside its own window, to even out the weeks. A legal duty is never moved later and a visit already made never moves. Nothing changes until you say yes, and you can pick which moves to take.

spread

For a new site whose plans all start at once, “Spread the first visits” lets Athena bring first visits earlier, by up to one interval, so the year’s work is not all in one month. Still never later than the window, never a legal duty later.

copy programme

Copy a site’s programme to another site: its plans go on the other site’s equipment of the same kinds, first visits spaced from the start date you pick as they were at the first site. Equipment already on a plan is skipped and listed. You see the counts before anything is copied.

coverage

Coverage lists equipment in service with no plan on it, by kind, most critical first, and plans with no equipment. Pick some and Athena drafts plans for them.

findings

When a planned visit is done, any failed step or reading outside its limits becomes a finding on the visit. Record what the equipment was found in and left in (good, fair, poor, failed), and raise a follow-up job from a finding.

quality

Each plan is checked as you write it: vague steps, readings with no limits, an interval longer than the law usually allows, a legal duty not yet marked, work at height or live work, another plan doing the same job, and minutes far from what the jobs took. The warnings never stop you saving.

meter

A plan can be due on a meter: “every 500 hours” or “every 10,000 km”. Its work order is made when a reading reaches the plan’s window, never on a forecast alone; until then the year view dates it from the meter’s readings.

readings needed

Readings lists the meters to read now, the longest unread first. Type the number and save; if it looks wrong you are asked once what happened, and nothing is changed for you.

statutory

Statutory plans, with their legal basis, a second approver and deferrals, arrive with the compliance module. Until then no plan is marked statutory.

condition trigger

A condition trigger brings a plan’s next visit forward when a reading goes over or under a limit, the equipment’s health drops to a band, or an alert is open. The visit is made at once, never twice while one is open, and not again inside its cooldown. A reading more than 7 days old is not acted on.

frequency optimiser

The Frequency Optimiser looks at what each visit found and what failed between visits, and proposes one step shorter or longer. It needs 6 visits or 12 months first. A legal duty is never made longer.

frequency decide

A person decides each proposal. Yes makes a new draft version of the plan with the new interval; activating it is your own step. The person who asked for a proposal does not decide it, and critical equipment needs a second person.

Module 09

meters

A meter on a piece of equipment counts run hours, kilometres, cycles or anything else that only goes up. Plans can be due on it: “every 500 hours”. Give it the number it rolls over at, how often it should be read, and its usual use a day until there are readings.

readings

Record a reading with its number, or “could not read” and why. Each reading is checked against the meter’s own history: lower than last time, ten times too big, two digits swapped, far faster than usual. It asks once; your answer stands and nothing is changed for you.

meter replaced

When a meter is replaced, give the old one’s final reading and the new one’s start. The running total carries on, so plans due on it stay right.

forecast

From the readings, the meter’s usual use a day says when a plan due on it will fall due. With no readings yet, or none for 60 days, the date is an estimate and the window is wider. A work order is only made when a reading reaches it.

health

Health is a score from 0 to 100 worked out from the equipment’s own history: failures in the last year and whether the fix held, its age against its expected life, overdue planned work and open repairs, and open alerts. Good is 80 and over, Watch 60 to 79, Act 40 to 59, Critical under 40. Each part says how it got its number.

health confidence

Confidence says how much the score has to go on. It is low with little history, no install date or no readings; the page lists what is missing and how to add it. Without monitoring models the score is from history only, and says so.

alerts

Alerts collects alarms from your monitoring, from alarm exports you drop in, and from people who report a fault. The same alarm on the same equipment again is counted on its open alert, not added as a new one.

alarm import

Drop in an alarm export as a CSV file with a header row naming the equipment (device name or serial), the code and the time. Alarms that cannot be matched to one piece of equipment wait under Not placed until someone puts them on it.

resets

Log every remote reset you or the control room did: how, when and whether it cleared. Each code’s reset rule is checked first. A code that must never be reset remotely, such as a fire, gas, overheating or insulation alarm on a battery, is refused: someone must go to site. Past its limit, the alert needs a site visit.

repeat resets

When one code on one piece of equipment is reset five times in 30 days with no site visit, a finding is raised for reliability: it keeps tripping for a reason.

alert work

Athena drafts the work an alert asks for: a repair, or a site visit with an inspection for a code that must not be reset. You raise the job. She never drafts work from a single alarm nobody signed, and never when open work on that equipment may be the same fault.

alert close

Close an alert by saying how it ended (resolved remotely, cleared by itself, work completed, not a problem) and whether it was real. An alert with an open job stays open until the job is done. Athena never resets equipment or closes an alert.

sources

A data source is where readings come from: the Relay on site reading OPC UA, Modbus, BACnet or SNMP, an MQTT broker, a historian or head-end export, or a signed push. We only ever read: nothing here writes to equipment or clears an alarm at the source.

source key

Each source has its own key, shown once when it is made. Put it in the Relay or gateway. If it is lost or leaked, make a new one: the old key stops at once. Passwords for the equipment stay on site and are never stored here.

source liveness

A source is Live while data arrives within twice its expected interval, Late up to six intervals, then Silent. Silent sources are listed first. A gap is shown as a gap, never as a zero.

tag mapping

Map each tag to a reading point on an asset: an existing point, or a new one in the unit you choose, with a scale and offset from the raw value. The pattern tool maps many at once, for example tags like INV{nn}_* to the asset Inverter {nn}. Every change is kept as a version you can roll back.

safety points

Mark fire, gas, pressure relief and emergency stop tags as safety points. Only a person sets or clears the mark; what the equipment says about a tag never changes it.

late data

Readings that arrive late, after an outage on site, are accepted up to the source’s limit (30 days unless you change it) and land in the right hour. The same reading sent twice is counted once. Older or future-dated readings are refused and the source says why.

models

A model watches one reading point on one asset: fixed limits, the normal band for each hour of the day learned from the asset’s own readings, or an unusually fast change. It learns, runs silently in shadow so you see what it would have raised, and goes live only when a person puts it live.

honesty

Each model shows how good it is on this asset’s own data: how often its alerts were real, which failures it caught and missed, how much warning it usually gave, and how many alerts still have no outcome. With fewer than three outcomes it says it is too early to tell.

model alerts

A live model raises an alert, never a job. The alert says which model fired and why. You raise the work from the alert, and close it saying whether it was real: that outcome is what grades the model.

retrain

Let a model learn again after changes to the equipment or its sensor, or after marking a period when it was faulty. A new version replaces the live one only if it does better on the same held-back readings.

programme

The condition monitoring programme shows which critical assets are watched by which technique, how often and by whom, and the gaps: criticality A and B assets that nothing watches for the failures their kind of equipment has. Athena proposes techniques and frequencies; you decide.

oil sampling

Oil sampling is tracked bottle by bottle: issued, taken (scan the sample point and the bottle on the phone, with or without signal), sent, at the lab and result back. Bottles that have not reached the lab after a week are flagged.

Module 10

failure coding

At the close-out of a repair you say what failed and why: the failure, its cause, how it was found and what was done. Codes for the job’s trade come first; “Show all” has the rest.

no fault found

“No fault found” is an answer of its own, with the reason: reset only, comes and goes, could not make it happen, false alarm or fixed itself. It has no cause.

not sure

“Not sure” always lets you complete the job. A reviewer codes it later; until then the job is not closed by Athena.

mtbf

Mean time between failures shows a dash until an asset has two failures: one failure says nothing about the time between them. “No fault found” and “Not sure” are not counted as failures.

code lists

The code lists start with a starter set. An Admin adds codes, renames them or retires them; a retired code stays on the records that have it, marked retired.

failure coder

When a repair is finished, Athena reads the close-out and suggests what failed, why, how it was found and what was done, from your own code lists. The suggestion is shown in the FailurePicker and the coding queue; you confirm it in one tap or pick your own. Athena never writes a code itself and never changes yours.

coding queue

The coding queue lists Athena’s suggestions waiting for a person, and finished repairs that still have no complete code. Confirm as suggested, or change and confirm; closed jobs can be coded here too.

bad actors

Bad actors ranks your equipment by failures and downtime over the last year, worked out from the failure records: the few assets that cause more than half of the failures, repairs that did not hold (failed again within 30 days), failure modes, age at failure and a weekly chart with its limits. With fewer than five failures the page says so instead of drawing conclusions.

availability

Availability holds each site’s figure for each day: the figure reported and, where it was corrected, the revised one, which is the one that counts. A day needs a figure or a reason; a day with neither is shown as missing, never as zero. A revision that lowers what is owed by more than your threshold waits for a second person.

exclusions

Exclusions are periods taken out of a guarantee: planned maintenance windows, grid events, client-caused stops and the like. Athena drafts them from outages that are back in service, with the plant-off and plant-back times as evidence, but only for the kinds your contract excludes. A person claims each one and records the client’s answer. A day wholly inside a claimed or agreed exclusion is left out of the cycle.

ld positions

The LD position for each cycle is worked out by the system from the daily figures and the guarantee’s terms, with the equation shown: for example 10 MW × (98 − 97.83) ÷ 100 × the rate. No model ever works out a figure. A person confirms a position (two people where your terms say so), and a confirmed position never changes.

defects

Defect elimination lists the equipment whose failures you are working to stop for good, worst loss first. The loss a year is the hours down at what an hour down costs, plus what its jobs cost on the money ledger; without the hourly figure the downtime is said, never priced at nothing.

defects proof

Mark the fix date and the year before it is frozen. After 90 days with no repeat failure a person can call it eliminated, and the saving a year is worked out from before and after. A failure after the fix says the fix has not held.

ld billing

A confirmed damages position goes on the client’s next invoice as a deduction, once. Ready to bill picks it up with everything else, and the position shows where the line has got to.

service credits

A service credit is worked out for an operator’s month at a site: the points of availability below the target times the credit for each point, never more than the month’s cap. Finance puts a confirmed credit on that operator’s next invoice as a deduction, once.

scorecard feed

The scorecard feed shows, for each contractor or team who guaranteed their work, how many jobs they guaranteed, how many came back as callbacks and were upheld, and how many repeat jobs followed within 30 days.

client review

The client review is the defect register without names, notes or what an hour down costs you: what was found, on what equipment, where it stands and what it saved.

studies

A reliability study (RCM or FMECA) works through what the equipment must do, how it can fail to do it, each way it fails, what that leads to and what to do about it. The task is worked out from your answers: check its condition, restore or replace on a schedule, test a hidden function, run to failure, or change the design.

studies sign

A study is signed by people. The person who wrote it does not approve it, and one with a safety, environmental or hidden consequence needs two different people. An approved study does not change; a new version does.

life data

Life data shows how long each kind of equipment lasts between failures. A Weibull fit is drawn once there are 8 failures with their times; below that the page says how many more are needed. Equipment still running counts too. Beta below 1 points at early-life failures, about 1 at random ones, above 1 at wear-out.

life data cost

Give what a planned replacement and a failure each cost, and the page works out the age at which replacing costs least per day. It only does when failures come with age and a failure costs more.

bundles

A bundle is the set of changes a signed study (or a life data fit) recommends: a draft maintenance plan for each task done on a schedule; for a task that checks the condition, when the person proposing says how it is checked (vibration, thermography, oil analysis and the rest), a check in the condition monitoring programme for each piece of equipment the study covers instead; and any spares they name for a failure mode (the part, the store it is held in, how many to hold back) on the critical spares register. One person proposes it and a different person approves it; Athena does neither. Applying makes each change through its own module, as the person who presses it; a check already in the programme is left as it is. Switching each plan on is still done on the plan page. Rolling back retires the plans, stops the checks and takes the spares off the register.

life data fits

Life data offers more than one fit. The straight-line fit is the everyday one. The best-likelihood fit gives a range: nine times in ten (90%) the true beta lies inside it. A failure-free period is shown when nothing fails before a certain age. With several failure codes, each gets its own fit and the combined curve shows when one in ten has failed, whatever the cause. Each needs 8 failures with their times.

fleet trend

With 20 or more of the same kind of equipment, the page also shows whether failures across them are coming closer together or further apart. If they are, a repair is not bringing them back to as good as new, and the page says to read the trend rather than the ordinary fit.

strategy compare

Compare ways of looking after a kind of equipment: run it to failure, replace it on age, check its condition, or change the design. Give what a planned job and a failure each cost; the page plays out 1000 possible futures from your own life data and shows the cost a good year (P10), a middle one (P50) and a bad one (P90). The same inputs always give the same figures.

library studies

The library has 10 starting studies (pumps, chillers, solar inverters, uninterruptible power supplies, passenger lifts, air handling units, air compressors, transformers, conveyors and sorters, standby generators). Adopting one copies it into a draft study that is yours to change; every rating says it came from the library until you change it. Check it against the maker’s manual.

study assistant

Athena drafts failure modes beside a draft study: from the library for its kind of equipment, or from the functions and failures you have written. How often a mode happens comes from your own failure records (the last 3 years) or the library, never a guess; when neither covers it, you rate it. Each draft waits for you to take it in or turn it down.

worksheet

Download any study as an FMEA worksheet in Excel, one row per failure mode. You can start a study from a worksheet too, in Excel or CSV with the same headings: every row is checked first and any problem is listed by its row number. The task is always worked out again from the answers.

Module 11

on hand

On hand is what the stock book says is on the shelf: every booking in, use, put back, move and correction added up. Nobody types it; it changes only when stock moves.

never negative

Stock never goes below nothing. If the book says there are 3 and you take 5, it stops and tells you: count the shelf, or take what the book says.

never counted

Never counted is not the same as none. A part nobody has counted in a store shows as Never counted until its first count.

levels

Set a minimum, a reorder point, a reorder quantity and a maximum per part per store or van. At or below the reorder point it shows as Short and goes on Order short; above the maximum it shows as Over.

last price

A part’s price is its last price: what was last paid on an order or typed when it was booked in. A part used on a job carries that price onto the job, marked last price.

used on job

I used this takes the part out of the store or van and puts it on the job with its price, in one go. Put back takes it off the job at the price it went on at.

count

A count starts by noting what the book says for every part in the store. Count the shelf, then someone who may confirm counts posts each difference. Stock used while you were counting does not show as a difference.

corrections

A correction says why, in a few words, with a reason. It is a new line in the stock book, never a change to an old one. You can undo your own movement for 15 minutes; after that, correct it.

retire close

A part cannot be retired, and a store cannot be closed, while stock is held there. Use it, move it or correct it first.

order short

Order short drafts one order per usual supplier for every part at or below its reorder point and not already on order. Athena can suggest it; a person checks and sends every order.

bins

A bin is a labelled spot in a store, in the order you walk it. Add one, or a range like A1 to D12. When all of a part is in bins, say which bin it came from; a bin holding stock cannot be retired.

lots use by

A part tracked by lot is booked in with its lot number and use-by date. Stock goes out oldest use-by first, and an out-of-date lot is never used on a job: quarantine it or write it off.

serials

A part tracked by serial number is booked in serial by serial. A serial is one unit, in one place at a time, and is scanned onto the job.

value

Stock is valued at the average cost of what was paid for it. Stock booked in with no price is shown as not priced and adds nothing to the value until someone prices it from the bill. Nothing is guessed.

quarantine

Faulty or doubtful stock goes to quarantine, never back on the shelf. Nothing in quarantine is used on a job. A person releases it, saying what they checked, or writes it off.

transfers

A transfer moves stock from one store to another. Once sent it is on its way: out of the sender, not yet in the receiver, and its value goes with it. If less arrives, a person settles the rest: back to the sender, or written off as lost.

refills

A van or a site store can be refilled from another store. Set where it is refilled from with its levels; Draft the refills drafts a transfer for everything short, from what the other store has free.

kits

A kit keeps a job’s parts in one store, so no other job takes them. Keep a list for a kind of job and every job of that kind can use it. Pick the kit, then issue it onto the job in one press.

count reasons

Every difference a count finds is posted with a reason. When the differences are worth more than the workspace’s limit, or any has no price, someone who did not count it confirms the count.

count scheduler

Athena starts a blind count each night of the stores that need one: stock never counted first, then stores past the count cycle. She never records, confirms or cancels a count.

reconciler

When a count is saved, Athena may suggest why a difference is what it is: in the wrong bin, used on a job and not booked, or boxes counted as singles. A person picks the reason; she never says lost or found.

kanban

A kanban card sits on the second bin. When the first bin is empty, scan the card: the refill is raised at once, from the store that refills it or to the buyer. Scanning it again does nothing until the refill has come.

critical spares

A critical spare is one whose absence turns a failure into a long stop. Say what it covers and how many are held back. The held-back quantity only goes on a job for the equipment it covers, or the failure it is kept for. Record each readiness check; a failed check shows it is not ready.

tanks

A tank is a store of one liquid. Dip it to record the level; the page works out the hours of running left from the level and the burn an hour, and says unknown when the last dip is too old. A delivery is booked in and checked against the level rise.

rma

Book a faulty part as a warranty claim, a repair or a core to send back. Each moves through its own steps to credit, replacement, repair or close. A core shows the days left before the late charge. Anything with no movement for 14 days is shown to chase.

approved parts

Record what a part is approved for, such as contact with drinking water, with its reference and expiry. When equipment needs an approval, a part without a valid one cannot be issued to its job. Only a person records an approval; Athena never does.

provision

The stock provision puts each line in an age band by its last movement and holds back the share you set for each band. Critical spares are shown apart. It stays a draft until someone in finance other than the person who drafted it signs it.

consignment

Consignment stock is the supplier’s, kept in its own store and left out of your stock value. The page shows what is on the shelf against the agreed levels and what was used, with the jobs, for the usage report.

freeze

Freeze a store while it is counted and nothing moves in or out of it except the count’s own differences. It moves again once the count is confirmed or cancelled.

labels

Labels print as a PDF sheet or straight to a Zebra label printer. A GS1 barcode on a box is read for its product number, lot, serial and use-by date.

offline issues

With no signal, an issue on the phone is kept on the phone with the time you did it, and sent when there is signal. If the shelf no longer covers it when it arrives (someone else took the stock first), it is held for the storekeeper with what took the stock: nothing goes below nothing and nothing is lost.

offline hold decide

A held issue is decided by a person: issue it now (from the same store once it is counted or refilled, or from another store), or drop it with why. Issuing it now is checked like any issue.

phone snapshot

The phone keeps the parts, the stores and what each holds, with the time it last synced, so you can look things up with no signal. It never changes them; the server does.

cost centres

Give each store its cost centre. Stock moved between stores on different cost centres posts a recharge to the money ledger: the value off the store it left and onto the store it arrived at.

valuation

Stock is valued at weighted average unless a person chooses first in first out or standard cost. Changing it values what is held the new way: first in first out starts from what each line is held at now; standard cost needs a standard cost on every part held.

standard cost

Under standard cost, stock comes in and goes out at its standard cost; what a delivery cost above or below it is posted to the money ledger as a price variance, never hidden in the stock value.

issue watcher

The Issue Watcher looks at finished jobs for parts said to be used that never came out of stock, and suggests issuing them from the store that has them (the job’s kit store, the van, the site). A person issues them; it never does.

kit builder

The Kit Builder looks at jobs starting in the next two days that have a bill of materials and no kit, and suggests keeping the parts in the store that has most of them, saying how many are short. A person builds the kit; it never does.

Module 12

need something

Need something? asks for a part or a service, from a job or on its own, in words or with a photo. If the part is already in a store it says so straight away. From a job, the job shows it is waiting on it.

suppliers

A supplier is a company on your list that you buy from. Set it up as a supplier, then someone who may approve suppliers approves it. Orders go only to approved suppliers.

orders go to

Orders go to the address on the supplier, and nowhere else. Changing it is confirmed another way first: a call to the number you already had, a reply from the old address, or a second person. Every change is kept.

order tax

Each order line shows its net, its tax code and rate, and its gross, from your workspace’s tax codes. The rate is the one in force on the day the line was priced; a later change of rate never changes a sent order.

approval band

An order whose total with tax is above your approval band needs someone other than the person who raised it to approve it before it is sent. Change the band in the buying settings.

sent by a person

Every order is sent by a person. Athena can draft one (Order short) and suggest it; she never sends, approves or cancels an order.

received

Booking in what arrived does the rest: a stock line goes into its store at the order’s price, which becomes the part’s last price; a line for a job goes straight onto the job’s cost.

bill

Photograph or upload the supplier’s bill on its order. Athena reads it twice and checks its net, tax and total against what arrived; a figure is trusted only when both reads agree. A person accepts the bill, and any difference is spread over the jobs and parts it was for.

contractor work

Issuing work to a contractor hands them the job through their access to your records and records what you agreed to pay. They say accepted, on site and done; once they say done, a person accepts it and the value goes on the job.

job cost

A job’s bought cost is its parts (from stock at their last price, or bought for the job at the order’s price, trued up to the bill) and its accepted contractor orders.

quotes

Ask several suppliers to price the same thing by a closing time. Each supplier with an address on file gets its own link to send its quote; a quote that comes by phone is recorded by hand. Any supplier on your list can be asked; only an approved one with its documents in order can be awarded.

sealed quotes

A sealed request keeps every quote’s figures locked away until the closing time, or until every supplier has answered: nobody sees them, Athena included, only that a quote came and when. Then a named person opens them. A quote that came after the closing time stays sealed unless the person opening them lets it in, with why.

award

Athena compares the opened quotes and recommends one: the lowest total from a supplier who can be awarded, then the quickest to deliver, with her reasons. A person always awards. Awarding to anyone else is fine; say why. The award becomes a draft order at the quoted prices, and the other suppliers are thanked.

three way match

A supplier’s bill is checked three ways: against the order (the price you agreed), against what arrived (and was not billed already) and against its own sums. If it agrees, it waits for a person to approve it for payment. If anything differs, it is held with what differs in plain words, and only a person clears it. Nothing is approved for payment by itself, ever.

no retyping

If a bill agrees with what arrived, there is nothing to type but its number, date and totals: its lines are what arrived and is not yet billed, at the order’s prices. Type the lines only when the bill differs.

pay less

Paying less than a bill says, or taking a supplier’s credit note, lowers what you owe, so it waits for a second person. The person who asked cannot confirm it.

owed

When a bill is approved for payment, what you owe that supplier goes onto the money ledger, due on the bill’s date plus their payment days, and the part of it bought for jobs goes onto those jobs’ costs once. Stock bought for the shelf costs a job only when it is used on it.

blanket orders

A blanket order agrees a value with one supplier up to a limit between two dates. It is approved on its limit and sent once. Each call-off against it is an order for what is on it, needs no approval of its own and is refused if it would go over what is left or falls outside the dates.

price lists

Keep each supplier’s price list or contract with the dates it is in force, and a lower price from a bigger quantity if they give one. A person puts it in force. An order line left unpriced then takes the price in force that day, and says it came from the list.

supplier documents

Record a supplier’s insurance and accreditations with their expiry, and say which ones each supplier must hold. A person verifies each one against the certificate. A supplier missing one, or with one unverified or run out, cannot be approved, sent orders, awarded quotes or issued work until it is put right. You see them running out 30 days ahead.

performance

On time and right first time come from your own records: on time is the last delivery on or before the date the order was needed by; right first time is nothing turned away at goods in and every bill matching when it came. Each figure opens the orders behind it.

queue

The buying queue is everything buying owes somebody now, in bands: bills that do not match, a second person needed, late deliveries, orders to place, bills to approve, quotes, requests, contractor work done, bills to come, supplier documents and price lists ending. Oldest first; nothing drops off until a person deals with it.

Module 13

likely

A job whose words name welding, a roof, a confined space and the like shows the permit it likely needs, with the words that brought it in, until one is raised for it. It is a hint: a competent person decides. Your organisation may add its own words.

stricter

Your organisation may make a permit kind stricter: more checklist lines to confirm and longer to read before signing. Never looser. The signing screen and the server ask for the same.

board

Permits shows every permit that is waiting, live, lapsed or waiting to be counter-signed at your sites, and the isolations that are on. A lapsed permit shows in red until someone hands it back.

raise

Raise a permit for the job, the place and the hours, and say who is in charge of the work. An electrical isolation permit lists its isolation points. It is sent to the people who may issue that kind of permit at that site, or to the one you pick.

issue

Only a person appointed in People, Authorisations, to issue that kind of permit, in date and at that site, can issue it, and never the person doing the work. Athena never issues, accepts, hands back, counter-signs or cancels a permit.

prove dead

An electrical isolation permit cannot be accepted until every point is locked off with a photo of the lock and the circuit is proved dead: test the instrument, test the point of work, test the instrument again, with the instrument’s serial number.

locks

Each lock belongs to the person who put it on, and only they take it off. Taking someone else’s lock off needs a written reason, and it is kept on the record.

hand back

When the work stops, the person in charge hands the permit back: every lock off, or the isolation kept on as long-term with a reason, a person accountable and a review date. Hot work waits for its fire watch. Then an authorised person who did not hand it back counter-signs it.

safe isolation

Working on your own with no one to issue a permit? Use a safe isolation record: the same points, locks and prove-dead, and the name of the person who knows you are on it and answers an SOS. It is never called a permit.

lapse

A live permit whose time runs out is marked lapsed by the system, and the people on it are told. Nothing ever extends or closes a permit by itself.

ceremony

Issuing and accepting a permit happen on a signing screen that cannot be rushed: the declaration stays on screen for a few seconds, you confirm each precaution on the checklist, then you hold the confirm button until it fills. It works with gloves on: turn on gloves mode in your settings for bigger buttons.

hv documents

The HV documents are a permit for work, a sanction for test and a limitation of access, each naming its HV circuit. No permit for work is issued while a sanction for test is live on the same circuit, and no sanction for test while a permit for work on it is live: suspend it or hand it back first. A limitation of access is for work near live equipment and never has an isolation.

earths

An HV permit for work or sanction for test is accepted only when its isolation is proved dead, verified by a second person who locked nothing off, and the circuit main earths are on. Only the holder of a sanction for test moves the earths listed on it, and puts them back before handing it back.

clashes

Permits that clash, such as hot work beside a confined space entry, are found when a permit is issued or resumed. A warning is issued only once the issuer says they have seen it. A block needs someone in charge of neither job to override it with a reason, and some blocks need a second person. The HV document rules are never overridden. Athena never overrides a clash.

confined space

A confined space entry names the space from the register and its attendant. It is issued only after an air test inside the limits, on a gas detector bump-tested today, by someone appointed as a gas tester, and only when the space has a rescue arrangement written. The attendant signs people in and out, never goes in, and the permit cannot be handed back while anyone is inside.

overrides

Overrides lists every protection that is defeated, such as a fire zone isolated or a trip bypassed, and plant left out of its normal state. Each one says why, what covers the gap and when it goes back. Someone appointed to authorise overrides approves it, and a second person checks it is back in service. A permit cannot be handed back while an override it raised is still on, unless it is kept with a new approval.

suspend

Suspending a permit stops the work and leaves the isolation on. An authorised person checks it again before it is resumed. Athena never suspends, resumes, issues or cancels a permit.

extend

Only someone who may issue that kind of permit extends it, never the person doing the work, and only up to the longest time and number of extensions the kind allows. Every check is run again. A hot work or confined space permit is accepted again by the person in charge after it is extended. A permit whose time ran out while it was suspended is extended as it is resumed. Athena never extends a permit.

switching

A switching schedule lists the HV switching steps in order. A second authorised person who did not write it checks it before it may run. Then each step is instructed, done and reported by the operator with what they saw, and read back and confirmed by the person who instructed it, one at a time and never out of order. If the operator sees something unexpected the schedule stops and the people on it are told. The way back runs only once the permit is closed. Athena never instructs or confirms a step.

held by others

When another organisation holds a precaution for your work, such as a network operator holding an isolation or a radio operator powering down, record it with their reference. A permit or isolation relying on it is not issued or proved until a person records their confirmation, a permit is not counter-signed until it is asked to come off or kept for other work, and the isolation is not removed until they confirm it is off. Athena never records a confirmation.

field checks

A supervisor or safety lead outside the working party checks live permits at the job: the permit shown, the right people, locks on, the air test in date, the fire watch there. A problem tells the issuer and the person in charge, and someone who may stop work on a check can suspend the permit from it. Field checks shows the live permits not yet checked today, the riskiest kinds first.

mopo

What can run when is the site matrix of permitted operations: for each condition, such as fire and gas detection impaired or wind over the limit, which permit kinds and activities are permitted, permitted with care, or not permitted. A person sets a condition in force and lifts it. When it comes into force, live permits it does not permit are suspended at once. A permit it does not permit is not issued, resumed or extended unless two people override it, and never for an HV document. Athena never sets a condition or overrides the matrix.

override escalation

An override still on after its time tells the people on it at once, then the supervisor half an hour later, then the site manager an hour after its time, once each. Nothing is ever put back or kept on by the system: a person puts it back, or keeps it with a new approval.

redundancy

A redundancy group is equipment that backs each other up, with how many must stay in service. A job on one of them does not start, and a step that takes a path away is not done, while that would leave fewer in service than the group needs.

Module 14

report something

Report something is one button for seven things: an incident, a near miss, an unsafe condition, unsafe behaviour, a hazard, a positive observation and an improvement suggestion. Say or type what happened, add photos or a voice note, say where and when; it takes under a minute.

no signal

With no signal the report is kept on the phone, with the time you made it, and sent once when there is signal. The record keeps both times.

anonymous

Report anonymously and your name is written nowhere: not on the record, not in the history, not in the audit trail. You get a follow-up code to read the reply. Anonymous reports need signal, so nothing that could name you is kept on the phone.

incident reference

Every incident has a reference such as INC-26-0041: the year at the site and a count that starts again each January. Observations are OBS- and actions ACT-.

statuses

An incident is Reported until someone classifies it or sets its level, then Under review. While an investigation is open it is Investigating; while its actions are being worked on it is Actions in progress; when they are done and waiting for a check, Awaiting verification. Then a person closes it. A closed incident can be reopened with a reason.

levels

Level 1 is first aid or minor damage; 2 medical treatment or moderate damage; 3 lost time, restricted work or significant damage; 4 a major injury or a dangerous occurrence; 5 a fatality. The level sets who reviews it: a supervisor at Level 1, then the responsible manager from Level 2, the safety lead from Level 3 and a director at Levels 4 and 5. From Level 2 an investigation is signed off before it closes.

matrix

The priority grid is how likely times how bad, 1 to 5 each: Low 1 to 4 (act within 90 days), Medium 5 to 9 (30 days), High 10 to 16 (7 days), Critical 20 to 25 (make safe now, act within 24 hours). A new action’s due date comes from its band.

classification

Classifying says what kind it was, the outcome (fatality, lost time, restricted work, medical treatment, first aid, near miss, damage only, environmental or no injury, in the words of the site’s country), whether it is recordable and why, how bad it was and how bad it could have been, and whether it could have been serious or fatal.

country rules

Each site uses its country’s rules: the regulator’s name, what a regulator report is called and the outcome categories. The incident keeps the version of the rules it was classified under. The rules are marked “check” until someone qualified in that country has reviewed them.

predict reading

Athena reads every new incident twice and writes its reading beside it: the kind, the outcome, how bad it was and could have been, a suggested level and up to two questions. When the two reads differ it says it is not sure. It never classifies, decides a regulator report or closes anything: a person does, and can use Athena’s reading with one tap.

who is told

At each change of status the person who reported it, everyone named in it, each of their line managers and the responsible manager are told. Anonymous reporters read the update with their code.

close rules

An incident cannot be closed while it is unclassified, its level is not set, recordable is not decided, the regulator decision is not made (or a regulator report has no reference), any action is still open or waiting for a check, a needed investigation is not signed off, a reviewer has not approved it, the reporter has not been told, or the closing comment is empty. The person who reported it, or anyone named in it, cannot close it.

regulator

The regulator decision is made by a person with the right to make it. If it must be reported, you send it yourself on the regulator’s own form and add their reference to the incident: the software never sends anything to a regulator for you.

investigation

An investigation has a lead (never someone named in the incident), a team, a target date, a method (5 whys, fishbone, timeline, barrier analysis or bow-tie), a timeline, findings and lessons. Causes are recorded as immediate causes, contributing factors and system root causes, and each can raise an action. The lead or the safety lead signs it off.

costs

Record what an incident cost: time lost, labour, people (cover and overtime), equipment, medical and other costs such as fines or clean-up, each direct or indirect. Give the amount, or the hours and the rate. Costs can be added after it closes.

actions

Every action from every report, investigation and inspection sits in one tracker with an owner, a due date from its priority, and evidence when it needs it. Someone other than the owner checks it. Moving a date needs a reason and the first date is kept.

evidence pack

The evidence pack is the whole incident as one PDF: what happened, people (only if you may see them), classification, reviews, the investigation, actions, costs, notices, every file with its SHA-256 and the full story of who did what and when. Who exported it is recorded.

regulator clocks

Each incident is read against its site’s country rules as soon as it is reported and again whenever it changes: what must be sent, to whom and by when, counted in the site’s own time (days end at midnight there; working days skip weekends and public holidays). Each one shows on the incident and on Due to regulators, and the safety lead has it on Needs you until it is sent, decided not reportable, or set aside with a reason. An incident does not close while one is still open.

reportability adviser

Athena’s Reportability Adviser says, beside your decision, whether the regulator must be told, under which rule, by when, and what else is due (an insurer’s notice, a compensation form). When something it needs is missing, such as the days off work, it says it cannot tell yet and asks. It never decides and never sends anything: you decide and send.

regulator forms

The regulator’s form is filled in order from the incident: the RIDDOR online report, the HSA’s IR1, WSIB’s Form 7, Cal/OSHA’s 5020, the OSHA 300 and 301. Copy each answer into the regulator’s own form, fill in what the record does not hold, send it yourself and add their reference to the incident.

injury logs

Where the rules keep a log per establishment (the OSHA 300), each recordable case is on it with its column, its days away and on restriction (counted to 180), and its type. A privacy case shows “Privacy case” instead of the name. After the year ends, enter the average number of employees and the hours worked and a company executive certifies the 300A. The 300A summary and the case data come out as the CSV files OSHA’s Injury Tracking Application takes; you upload them.

rams word

A task risk assessment is called what your site’s country calls it: a JSA in the US, RAMS in the UK, a SWMS in Australia, a JHA in Canada. It is the same record everywhere: the job step by step, what could hurt someone at each step and the controls.

rams draft

Type the job in one sentence and press Draft it. Athena writes the steps, the hazards and the controls, starting from your starter library when a task there fits, and says what it could not find. It always adds work at height, live electricity, confined spaces, hot work, vehicles, chemicals and heavy loads when the sentence names them. The draft is yours to change; Athena never approves it.

rams hierarchy

Controls are listed best first: remove the hazard, use something less dangerous, guard or isolate it, a safe way of working, then protective equipment. A hazard controlled by protective equipment alone is pointed out before approval.

rams approve

The person who wrote a version sends it for approval; someone else approves it. It cannot be approved while a hazard has no control, no hazard is listed, or the emergency line is empty. Approving puts it in force, replaces the version before and starts the review clock (12 months unless you change it).

rams sign on

At the start of the shift, open it on your phone and press Start the sign-on. Pass the phone along: each person reads the key points, puts their name and signs on the screen. Contractors and visitors sign the same way. With no signal the signatures are kept on the phone and sent once when it comes back.

rams versions

Each person signs each version once. When a new version is approved, everyone signs again, and the phone shows what changed first. A version that has been replaced cannot be signed. A signature is asked for again after 12 months even with no new version.

rams library

The starter library holds ready-written tasks for your sector. Use one and it becomes a draft here for you to fit to your site and send for approval.

talks view

Safety meetings holds your toolbox talks and safety meetings in one place: the topic library, what is booked, the talk being given now, who was there, the minutes and the actions raised.

talks draft

Type a topic, or pick a recent incident, and press Draft it. Athena writes the points to say and a short quiz, starting from your starter talks when one fits. The draft is yours to change: nobody gives it until you save it as ready. Athena never gives a talk or signs for anyone.

talks qr

When you start a talk, your phone shows a code. Each person scans it with their own phone (Scan, or the phone’s camera), takes the quiz and signs. With no signal their signature is kept on their phone and counted when it arrives, as long as it was signed while the talk was on.

talks one phone

People without the app, contractors and visitors sign on your phone instead: press Sign on this phone and pass it along. Each person puts their name, answers the quiz and signs on the screen.

talks actions

Actions raised in a talk or a meeting go on the one action tracker with an owner and a due date, and the owner is told. Write the minutes on the same page.

talks missed

When the talk is finished, the people it was booked for who did not sign are listed. Send them the talk as a briefing and each one acknowledges it on their phone.

talks evidence

A talk with no signatures 48 hours after it started shows as not evidenced. A talk given on paper is finished with a photo of the signed sheet.

speak how

Speak or type it: say what happened in your own words and your own language, in the app or by scanning a label with your phone’s camera (no login). Athena fills in the report and marks every line it filled; check each one, change what is wrong, then send it.

speak languages

People can report in any language Athena reads. The report keeps their own words beside the English, marked "Translated by Athena", and anything said back to them goes in their language. The reporting page itself is in English, Spanish, Polish, Portuguese, French, Romanian and Arabic.

speak checked

Each line Athena fills stays marked until the person who reported it presses Right or changes it, and Send waits for every line. If they never send it, it goes to the safety lead after 30 minutes anyway, marked "not checked by the reporter", so no report is lost. The incident shows which lines Athena filled and which ones the reporter changed.

speak gate

At a label with no login, the report goes in without anyone’s name and the person gets a follow-up code to read the reply in their language.

speak channels

Reporting by WhatsApp and by phone call is ready to switch on once a WhatsApp and phone provider is set up for your organisation. Messages about a safety report never cost credits.

lone what

Working alone: start a session, name two people, and check in when the phone asks. If you miss a check-in, the system texts and alerts those two people, and then whoever is on call and the safety lead. The server’s clock decides, so a phone with no signal is still watched.

lone not monitored

This is not a 24-hour monitored service: the people alerted are your own team. If nobody answers, call emergency services yourself.

lone first

Before your first session the phone shows what will happen and checks its notifications, location, background running and battery settings. The countdown never starts until you have read it.

lone offline

No signal? Press I’m OK anyway: the check-in is kept on the phone with its time and sent when the signal comes back. If it arrives after the check-in was missed, the people alerted are told you are safe.

sos

Hold SOS for a second. It goes at once, by push and by text, to whoever is on call, then the people watching you. If nobody has it after a minute it goes again, wider. After 90 seconds the phone tells you to call emergency services. Only you can cancel your SOS; a supervisor resolves it once you are safe. Athena never acknowledges, cancels or resolves an SOS.

dra

The risk assessment at the point of work is five questions: height, live or high-voltage electrics, a confined space, working alone, anything unusual. A yes to height, electrics or a confined space sets the level, and nothing answers it down. The level sets how often you check in.

lone break

On a break, press Break and say how long (up to an hour). The check-ins wait until the break ends; if you are not back by then, the people watching you are told, as for a missed check-in.

lone journey

Leaving site alone? Press Heading home and give your arrival time. If you have not arrived by then, the people watching you are told that you have not arrived. Press Arrived to finish.

lone board

The lone-worker board shows everyone working alone, worst first: SOS, missed check-ins, overdue, silent phones, due soon, on a break, travelling. A supervisor who has spoken to someone can move their next check-in on by 15, 30, 60 or 120 minutes with a reason. “Spoken to, safe” is recorded but does not reset the clock.

lone silent

A phone that reports in the background and goes quiet for ten minutes shows as silent on the board, before any check-in is missed. A low battery tells the people watching you once. Athena never checks in, moves a check-in on or stands a session down.

sos incident

Every SOS opens an incident straight away, so the record exists whatever happens next. A man-down alert (the phone asked if you were all right and nobody answered) and a duress PIN (a silent alarm: the phone looks as if it checked in) are SOS alerts too.

asbestos presume

Where your organisation lists words for intrusive work (drill, core, chase), a job that names one at a place with nothing on the asbestos register waits until you confirm you will treat the place as containing asbestos.

asbestos

A place with asbestos on its register shows each entry before you start a job there. You confirm you have read them, and start work is refused until you do. An entry marked Stop needs the duty holder’s say-so, with their reason.

dra sets

The questions people answer before they start are a question set. There is one for every job, and there can be one for a kind of work, a kind of equipment or a site. A set in use is never changed: a new version applies to new assessments only.

dra gates

Some answers set the level and nothing answers them down: working at height, near anything live or in a confined space, bad weather, no signal. Some answers stop the job: missing protective equipment, faulty equipment, a reading over its limit. Then the job is held until a supervisor talks it through.

dra held

A held risk assessment tells your line manager and the safety lead. You cannot start working alone on it until a supervisor has talked it through with you and said go ahead. They can also stop the job. Athena never answers, releases or lowers a risk assessment.

dra same

On a job that carries on over several days, Same as yesterday shows yesterday’s answers. Change anything that is different; the floors and the stops are worked out again from every answer.

dra typed

Anything else you type (for example "the ladder is wet" or "there is a gas smell") is matched to the fixed hazards: height, live electrics, confined spaces, hot work, vehicles, chemicals, heavy loads. A match raises the level.

rams review

Every task risk assessment in force has a review date. When it is due, or someone asks for a review (after an incident, say), a competent person reads it again: if it is still right, Reviewed starts the clock again; if anything must change, start a new version and get it approved. Athena never reviews or approves one.

rams site copy

A site can have its own copy of a default task risk assessment, under its own country’s word. When the default gets a new version, every site copy is asked for a review, so the two never drift apart unnoticed.

rams reading

Athena reads each task risk assessment sent for approval, and each contractor’s, and lists what is missing beside it: a hazard the job names but nothing covers, work at height with no rescue plan, electrical work with no isolation, a confined space with no permit, gas test or rescue, hot work with no permit or fire watch, or someone working alone where the site does not allow it. A person decides.

rams contractor

A contractor’s RAMS is taken in for review and read against this site’s rules at once. Someone other than the person who took it in approves it; anything that blocks it must be fixed first. Return it with comments, or reject it with the reason. A resubmission shows what changed since the one returned.

incident hold

An incident goes on legal hold by itself when it was high or critical, could have been serious or fatal, or a regulator must be told. A held incident and its records are kept as they are and it cannot be cancelled. Only a person lifts the hold, with the reason; the rules never put it back once a person has lifted it.

incident regulator form

Make the regulator’s form from the incident: the fields come in the regulator’s order, filled from the record, with blanks for what the record does not hold. Every line is marked check. You send it yourself, then record the reference the regulator gives you: that is what stops the clock. Athena never sends or files a regulator report.

incident who reports

Who must report: we report injuries to our own people. A contractor’s or agency worker’s employer reports theirs, so tell them the same day. For anyone not at work for us (a visitor, a member of the public) we report as the people in control of the place, if the rules need it. Every line is check until someone qualified in that country has reviewed it.

investigation draft

Athena can draft an incident’s timeline from its own records (the report, the risk assessment, the lone-worker session, the SOS, the job and its permits, the statements and photos), every line showing the record it came from, and the possible causes those records and the statements show, each with its evidence. The lead decides every cause and signs the investigation. Athena never closes, signs or blames anyone.

rams send to clients

If you work for clients who use Predict & Maintain, send your approved task risk assessment to them from here: pick the clients and their sites, and each one gets its own copy of the version in force. You see what each client did with it. Send it again after changes and they see what changed. They only see what you send.

rams sent to us

Contractors who work for you can send their RAMS from their own Predict & Maintain. It waits here until someone takes it in; then it is read against this site’s rules and decided like any contractor’s RAMS, by someone other than the person who took it in.

rams sign on sheet

Download a task risk assessment as a PDF with a sign-on sheet at the back. The sheet’s code opens the sign-on for that exact version on a phone; anyone without a phone signs the sheet. A printed copy can go out of date, so the phone always shows the version in force.

lone worker contractors

Contractors’ people working alone on your sites show here when their company runs the job in its own Predict & Maintain: who, which company, how their check-ins stand and which site, never where they are. Say who watches them: the company, you, or both.

regulator year clocks

Where a site’s rules have yearly duties (in the US, the 300A summary certified by an executive, posted from 1 February to 30 April, and for some establishments the year’s data sent electronically by 2 March), each shows as a clock. Record when it was certified, posted and sent. Every rule is marked check until someone qualified in that country has reviewed it.

regulator escalation

When a regulator deadline is under 24 hours away and nothing is recorded as sent, the safety lead is told. If it is still open with six hours left, the site manager (or the owners) are told too. Each is told once.

Forms

what

An inspection is a form you fill on the walk: Pass, Fail or N/A, Yes or No, a choice, a reading, a note or a photo for each question, then your signature. It gets a reference such as INSP-12 when it reaches the server.

offline

Inspections work with no signal. Open the inspection once while you have signal and the phone keeps the form; every answer is saved on the phone as you go, and the whole inspection, its photos and its actions are sent once there is signal again.

failed items

Every item that fails becomes an action on the action tracker the moment the inspection reaches the server, with an owner and a due date set by how serious it is. You see the actions before you send and can change who owns each one; otherwise it is yours.

score

Each Pass scores its points and each Fail scores none; N/A is left out. The inspection fails if any critical item fails, or if it scores below the pass mark when the form has one, otherwise if anything failed.

weighted parts

A form can give each part a weight, so a part that matters more counts for more: the form’s percent is each part’s percent counted by its weight. A part can also have its own pass mark; if it falls below it, the whole form fails whatever the total. A part where everything was N/A is left out. The score is worked out by the product from the answers, never guessed by Athena, and kept with the version of the form it was filled on.

grades

Grades put a name to the percent a form reached, such as Good from 90% and Needs work from 60%. They are set on the form and shown with the result.

total

A total is worked out, never typed: readings on the form added up, or the parts booked on the job (how many, or what they cost). Until every reading it adds up is in, it shows what it is waiting for rather than a smaller number.

paper

Photograph a filled-in paper form, or upload it as a PDF, and say which form it is. Athena reads it twice, with two different models. An answer is filled in for you only when both reads give the same; anything they disagree on, or only one saw, is left for you to read off the page and type. You check it against the page and accept it; then it is a completed form like any other, scored by the product, with its failed items raised. The page is kept with it.

certificate

A form can be set up to issue a certificate, such as a gas safety record. Once a completed form has passed, someone allowed to issue certificates issues it: it gets the next number in your certificate series and their signature. When the form names a qualification the issuer must hold, the product checks it is held on the day. Athena never issues or signs a certificate. A certificate is never changed once issued: to correct one, issue a new one that replaces it.

certificate countersign

A form can ask for its certificates to be countersigned. Someone other than the issuer countersigns it, and when the form names a qualification for countersigning, the product checks they hold it on the day. A certificate that needs a countersign is not sent until it has one. Athena never countersigns.

certificate send

Send a certificate to the client from the Certificates page: give up to five email addresses. Each person gets their own link to the certificate and its PDF; you see when it was first opened. The link always says whether the certificate is still in force, so a replaced or voided one is never mistaken for the one in force. Download the PDF from the same page to print it.

photos

A question can ask for a photo when it fails, or always. Photos are kept on the phone under a fingerprint of the picture and count as received only when the server holds exactly the same picture.

starters

The starter library has a weekly site safety walk for every sector and checks for general industry, warehousing, construction, facilities, energy and food. Adopt one and it becomes your own form, which you can change. Items marked “check” read like a legal duty: confirm them for each site before relying on them.

versions

A form in use never changes underneath anyone. Changing it puts a new version into use; an inspection already started finishes on the version it started on.

schedules

A schedule says which inspection is done where, how often and by whom. The day before it is due it appears on that person’s Today with a reminder, and it is marked overdue if it is not done on the day.

writer

Athena writes a form from a sentence saying what it is for, or from your old one as a Word, Excel or PDF file. She keeps the old form’s own questions and leaves out what is filled in by itself: the site, the date and time, who filled it in, and the signature. It costs 1 credit, or 1 a page for a file. It arrives as a draft for you to check; nobody can fill it until someone approves it.

builder

In a form you add questions from the list of kinds (Pass, Fail or N/A; Yes or No; a choice; a reading; words; a date; a photo), put them in parts, say which are needed, which fail the whole form, and how soon a fail is put right. The phone and computer previews show it as people will see it.

logic

A question can be asked only after a certain answer to an earlier one, for example “Which pump was noisy?” only when “Both pumps run quietly” fails. A question that is not asked is not needed and cannot fail.

approval

Changes to a form in use make its next version; the version in use carries on until someone with the right to put forms into use approves the new one. Send it for approval with a note of what changed; the approver can approve it or send it back with what to change.

on job

Fill a form on a job or on an asset from the job’s or the asset’s page: it is kept with that job or asset and its place, and works with no signal like every inspection.

library

The library has ready-made safety forms for every sector: fire doors, emergency lighting, extinguishers, fire alarm tests, water temperatures, extraction, ladders, protective equipment, first aid, work platforms, lifting gear, chemical stores, portable electrics and plant rooms, beside each sector’s own checks. Items marked “check” read like a legal duty: confirm them where you use the form.

Compliance

duty

A duty is one thing the law, a regulator, an insurer, a contract or your own policy asks for. Adopt it from the library and it keeps its citation, how often, what proves it and how hard the interval is.

check badge

Library duties marked “check” were drafted from public sources and have not yet been checked against the current edition by a named person. The mark stays on every screen until someone checks it; the Brain can never remove it.

nations

Each duty says which nations it applies in. A duty for England cannot be put on a site in Scotland: set the site’s nation and the right row is used.

obligation

An obligation is one duty on one asset or place. Each pair exists once, with its state worked out by the server from the certificates, the linked work and the dates.

states

Compliant: a satisfying certificate on file and inside its date. Due soon: inside the warning window. Overdue: past the legal latest. Non-compliant: the last certificate failed, is missing something, or the work was done by someone not competent. Overdue, mitigation approved: not compliance, and counted as non-compliant. Not applicable: declared, with a reason. Unknown: nothing on file, never counted as compliant.

awaiting evidence

Work alone never turns an obligation green. When the linked work is done and the certificate is not in yet, it shows “done, awaiting evidence” until the certificate arrives.

events

Some duties fall due because something happened: moving a lift to a new site makes its examination due that day. A retired asset’s obligations end and keep their history.

certificate

Add a certificate against the obligations it proves. It is checked against what that kind of certificate must contain; one that is missing something never satisfies an obligation unless a named person accepts it with a reason.

verification

A certificate for a statutory duty counts once someone other than the person who added it has verified it. You can switch the second person off in the compliance settings.

rule wins

When the date on a certificate and the duty’s rule disagree, the rule sets the legal latest; the certificate’s own date is kept and shown.

stricter only

A duty can be made stricter at any time: a shorter interval, records kept longer. Making an interval longer needs a risk assessment and the duty holder’s signature, and is refused outright for an interval fixed in law.

not applicable

Declaring an obligation not applicable is a person’s decision with a reason. It shows as declared, never as deleted, and can be withdrawn.

requirements

A requirement says who or what must hold which certificate, for example to do the work or to enter a site. Each holder shows held, expiring, expired, deficient or missing, and every page reads the same answer.

links

Planned maintenance, work orders and the planning board read the legal latest and which duty a job evidences from here, so a statutory job shows its duty wherever it appears.

duty mapper

Map my duties looks at your sites, the nation each is in and the kinds of equipment you have, and proposes the duties from the library that apply, with the assets and places each covers. Nothing is adopted until you apply it; each obligation starts as Unknown, nothing on file.

basis unverified

Every duty in the library says “basis unverified” until a named person on our side checks it against the current edition of the law or standard. A British Standard is shown as a standard, never as law.

duty holder

Name a duty holder for each duty. The nightly check tells them when something falls due with nothing booked, goes overdue or fails, and passes it to the compliance lead after a week.

reader

Drop or photograph a certificate and Athena reads it twice, with two different models. A date or an outcome is filled in only when both reads agree; otherwise you type it from the certificate. You always say the outcome yourself.

second person

A statutory certificate you file counts once someone else in the workspace verifies it. Until then the obligation keeps its old state, so no date is trusted on one person’s word.

matrix

The matrix shows each site against each duty family: green compliant, amber due soon, red overdue or failed, grey unknown. Unknown means nothing on file and is never counted as compliant. Big Six and Building safety are ready-made views.

calendar

The calendar shows what falls due by its legal latest date, week by week, against what is booked. Book unbooked raises a job for every obligation in view with nothing booked.

reminders

Reminders about obligations go only to people in your workspace. Nothing is sent to a contractor or anyone outside it.

gaps

Find the gaps lists every obligation with nothing on file, with the kind of certificate that would prove it.

schedule

Schedule an inspection once: which form, where, who does it, how often and from when. Each one appears on that person’s Today the day before it is due (or as many days before as you set), with a reminder, and is marked overdue if the day passes.

done

A due inspection is done the moment it is sent, from any phone. Its score and its failed items show on the schedule, and each failed item is already an action on the tracker.

notices

Notices keeps every statutory notice with its own clock: the copies residents must get (a gas safety record within 28 days of the check, an electrical report, the written summary after a damp and mould investigation) and the notices a regulator serves on you, with the compliance date and the appeal window.

notice copies

When a gas safety record or an electrical report for a home is filed, the copy for the resident is drafted for you with its due date. A person checks the words and serves it; it is never sent by text alone, and a letter is the fallback when email cannot be used.

notice regulator

Each kind of notice names its regulator from the pack for the site’s nation. Every kind says “check” until a named person has checked the current law.

notice human

Athena can draft a notice for you and read a regulator’s letter into the fields. Serving a notice, recording an appeal or that you complied, and closing a notice are always a person’s acts.

tsm

The Tenant Satisfaction Measures’ building-safety set (BS01 gas, BS02 fire, BS03 asbestos, BS04 water, BS05 lifts) is counted from your obligations and certificates as at 31 March: homes, buildings or lifts whose checks were all carried out, out of those that need them. Each figure lists the ones not met and the ones left out, with the reason.

housing rows

The social housing pack adds smoke and carbon monoxide alarms for each nation, the five-yearly electrical report in social homes, communal fire doors every three months and flat entrance doors every year in buildings over 11 metres, and fire safety information to residents. The schools pack adds fume cupboards, workshop extraction, lab gas interlocks, PE equipment, workshop machines and pools.

findings

Findings lists every defect a certificate, an inspection or a notice raised, with its grade, the date it must be put right by, the person tracking it and the job that fixes it. The scheme’s own code (C1, C2, FI) is kept exactly as written.

finding dates

Each grade has a longest time to put it right. You can bring a date forward with a reason; a later date needs an approved mitigation, never a quiet change.

finding close

A finding is closed by a person with the evidence: the finished job, a photo, or the certificate from the retest. An immediate danger closes only with a satisfactory retest certificate or the competent person’s signed statement. Athena can raise a finding; it never closes one.

packs

An evidence pack is put together from the records you already hold, for one duty, one site and a period: each certificate, job, finding, notice and obligation with its fingerprint (SHA-256), and what is missing listed at the top. Nothing is typed in.

pack seal

A person seals and signs a pack as a true extract of the records on the day. If anything changed since it was put together, put it together again first. A sealed pack never changes; Check it compares it with the records today and lists what changed, was added or has gone.

register

The register counts what is done, due and missing by nation and by the regulator the library names for each duty. Not applicable is left out; overdue with a mitigation still counts as missing.

issued filed

A certificate issued from a passed form files itself against the duties it proves on that equipment or place, and each finding it was passed with is raised as a finding.

pack narrative

Athena writes a narrative beside a draft pack: where things stand, what happened in the period, every gap in its own sentence and what was done about it. Every sentence shows the numbers of the items it rests on. A sentence she could not cite is marked, and the pack is not sealed with it.

pack narrative seal

When you seal a pack with a narrative beside it, the seal covers the narrative too: its fingerprint is part of the seal. You can seal the pack without the narrative; then the narrative is not part of what you signed.

pack files

Download a pack as a PDF, or as a ZIP with the PDF, manifest.json (every fingerprint, for checking later) and the original files the pack’s certificates and closed findings rest on.

pack share

Share a sealed pack by link: name who it is for, how many days it works (up to 90), or one visit (it stops an hour after it is first opened). The link is shown once, or emailed once. Every time it is opened is kept, and you can stop a link working at any time. A draft is never shared.

watch

Regulatory watch lists the regulators’ sources you follow and every change they published, newest first, with the duties each one may touch. Regulators come from your jurisdiction pack.

watch suggest

Athena reads each change and suggests which of your duties it may touch and what to look at. It is a suggestion: Athena never changes a duty, and every legal fact stays marked check until the named reviewer signs.

watch decide

A person decides what a change means (no change, change a duty, add one, retire one, or keep watching) and names the reviewer. The named, qualified reviewer then signs it or sends it back; it is never the same person. A signed decision never changes.

watch apply

After a decision is signed, change the duty on its own page. Nothing changes a duty by itself.

watch sources

A standard’s text is licensed, so only its title and date are kept. A source whose terms forbid automatic reading is never fetched: it shows check by hand. A source not read for 30 days shows stale.

watch reviewers

Name the people qualified to sign regulation decisions, with what qualifies them and the jurisdictions they cover.

Module 17

library

Documents holds your manuals, procedures, risk assessments, permit procedures, safety data sheets, drawings and certificates in one library, each with a number, an owner, its versions and the records it is linked to.

add

Add a document from a file (PDF, a photo or a text file) or paste the text. Manuals, drawings and certificates are in use as soon as they are added. Procedures, risk assessments, permit procedures, induction packs and policies are controlled: they wait as drafts until someone who may publish them (a safety lead) puts them into use.

versions

A new file of a document is a new version, with a note of what changed. The version in use stays in use until the new one is published; then the old one is kept, marked superseded, at its own address, so a job or a sign-off can always show the exact file that was read.

withdraw

Withdrawing a document takes it out of use for everyone, with a reason: it shows “Withdrawn: do not use”, it is never offered by Ask, and its links stay. A safety lead can restore it.

reviews

Controlled documents have a review date. Mark one reviewed with a note and the next review moves on by its cycle. The library shows what is due for review and what has expired.

links

Link a document to an asset, a work order, an incident, a task risk assessment or a site, and it shows on that record. Put a photo or a file straight on a record as an attachment; Keep as a document moves it into the library.

read and acknowledge

When a new version of a safety document is published, send it as a briefing from its page: each person gets it on their phone and says Got it, and the page shows who has and who has not.

ask

Ask the manual answers a question from your own documents only, by quoting the words on the page, with the document, the version, the page and the paragraph. Tap a quote to open the page. When nothing in your documents answers it, it says it does not know.

ask safety

Ask never tells anyone how to bypass an interlock, defeat a guard or work without a permit: it says “That is not in an approved procedure; ask your supervisor.” Text inside a document that tries to give orders is treated as words on a page, never followed.

ask offline

With no signal, Ask searches the documents you opened on this phone and shows the matching pages instead of an answer. If Athena is not available, it shows the matching pages from the whole library.

hidden text

When a PDF is added, text a reader cannot see (white on white, tiny, off the page) is left out of search and Ask, and the version says how much was left out.

file checks

Every file that comes in is checked that it is the kind of file it says it is. One that is not (a program named as a photo, a web page named as a PDF) is set aside, never shown and never counted as evidence. When the virus check is on, a file it finds something harmful in is set aside the same way, with the reason kept.

credits

Searching and asking the documents are in the price of every plan: they use no credits.

queue

Documents to look at lists reviews due in the next 30 days or overdue, documents expiring in the next 60 days, documents in no folder and linked to nothing, and the same file added twice.

review reminders

Switch review reminders on and each document’s keeper is told once when its review comes within 30 days, and once more if it passes. The review itself is always a person marking it reviewed.

librarian

When a document arrives, Athena suggests where it belongs: the equipment it names, its kind if it was filed as Other, and the folder for that kind. A person approves each one. She never changes a controlled document’s kind.

known fixes

Known fixes are what fixed a fault before: what you see, and what fixed it, for one piece of equipment, its make and model, or its kind. They show on the job, most helpful first. Anyone can add one; a library keeper puts it in use.

controlled register

Controlled documents lists every controlled procedure, risk assessment and plan with its owner, its next review, the version in use, who approves it and how many of the people it goes to have read and signed the version in use.

approval

A controlled document can name the person who approves it. Each new version stays a draft until that person approves it, and they never approve a version they added themselves. With nobody named, the person who may publish and puts it into use is recorded as its approver. Athena never approves a controlled document.

read and sign

Say who a document goes to, by name or by team. Each person signs that they read the version in use; a new version asks everyone again. Only the version in use can be signed for.

watermark

A superseded or withdrawn copy opens with “do not use” across it, and a controlled draft says it is not approved, so nobody works to the wrong version.

People

person

Everyone the work touches has a person record, with or without a login: a contractor’s labourer or a visiting engineer can be planned, inducted and have hours recorded without ever signing in.

login

A person with a login is linked to their membership of the workspace. One login is one person here; their roles and what they can open are set in Settings.

directory

Everyone in the workspace sees the directory: names, teams, job titles, work phone and email. Private numbers and emergency contacts are seen only by those allowed, and every look is recorded.

duplicates

Adding someone whose work email is already used is refused. A name that is already here asks whether it is someone else before adding them.

import

Import a spreadsheet of people: rows that check out are added, every other row is listed with why it was skipped (no name, an email that is not one, a team that does not exist, someone already here).

teams

Teams can sit inside teams. A team marked “planned as one crew” can be given work as one on the plan. Taking someone out of a team ends their membership on a date; nothing is deleted.

patterns

A shift pattern is a week: the shift on each day and its break, or a rest day. Everyone starts on Days, Monday to Friday 08:00 to 16:30, unless they are put on another. A night shift belongs to the day it starts.

patterns words

Patterns can be written in words, such as “Nights, Mon–Thu 22:00–06:00” or “weekends 7am to 7pm, 60 min break”. Patterns longer than a week, such as four on four off, come with the full pattern editor.

capacity

The hours the plan can use each day are the shift less its break, times the share free for planned work (75% unless the pattern says otherwise), less any absence. A morning or afternoon off halves the day.

pattern change

Putting someone on a new pattern applies from a date, never to days already worked, and it changes their hours, so Athena can only ask first.

skills

The skill library lists each skill once with its levels, how long it lasts and which trade’s work needs it. Starter skills can be added in one go and changed afterwards.

competence

A competency counts once there is evidence: a person records it, usually from a checked certificate, and it expires on the certificate’s date or after the skill’s validity. Skills added with a new person wait for evidence.

certificates

A photo or PDF of a certificate is uploaded with its dates; a second person checks it against the photo. Nobody checks their own certificate or records their own competency, and Athena never does either.

competence check

When work is planned, the plan checks the person holds the skills that trade’s work needs, at the level, on the day. For now a gap is a warning beside the job, not a block.

absences

A supervisor records leave, sickness or training for someone, whole days or half a day, and the plan stops counting those hours at once. Leave requests and balances come next.

left

Marking someone as left sets their last day; their teams and pattern end with it and their records are kept. Taking their login away is done in Settings.

roles

A job role, such as forklift driver or first aider, lists the training it needs. Putting someone in a role, at one site or wherever they work, adds what the role needs to their row of the matrix from that day.

requirements

Training can be needed by everyone, by a job role, by everyone working at a site, or by a role at one site, at a level if it matters. Each says how many days before it runs out the person and their manager are told: 30 unless you set another number.

matrix

Who is missing what lists everyone who needs a certificate they do not hold, has let expire, has not had checked yet, or will soon lose, with the site it is needed at. Filter by several roles, sites, certificates and states at once.

reader

Photograph a certificate, or upload its PDF, and Athena reads the name, what it is, who issued it, its number and its dates. It reads twice and only trusts a date both reads agree on; any other date you type. It never fills in what the certificate does not show.

confirm

What Athena read goes onto the certificate only when someone confirms it, the holder or whoever uploaded it. If the name on it is not the person’s, say it is theirs first. A second person then checks it against the photo before it counts.

reminders

Before training runs out, the person and their line manager each get a reminder on their Today page and by push or email, once. If it runs out, they are told again. Renewing it closes the reminders.

rota

The rota is drafted from each person’s shift pattern for a period and stays a draft, seen only by those who edit it, until someone publishes it. Days that already have a shift, and whole days off, are left as they are.

on call

On call is a layer of the same rota: who, which tier, one site or every site, from when to when. Only published slots count: an escalation or an SOS reaches whoever is on a published slot then, tier 1 first, and never someone off on approved leave.

rota gaps

Each morning the next seven days are checked for times nobody is on call, and the people who edit the rota get a card for each gap. Athena can suggest who could cover it, fairly; a person always puts them on and publishes.

rota publish

Publishing changes people’s hours, so only a person can do it. Athena can draft and suggest shifts and slots, never publish them.

leave

Ask for leave on your phone: the days it takes are counted from your shift pattern, and you see what is left this leave year. Your line manager or team lead approves it, or declines it with a reason. Nobody decides their own.

leave balance

A balance is the year’s entitlement plus days carried in, less leave taken and booked. Entitlements are set per person per leave year; until one is set, the kind of leave’s full-time figure is used. Check it against your contracts.

leave private

Your balance and your hours are yours: you see them, and so do your line manager, your team lead and whoever is allowed to see everyone’s. Nobody else does.

authorisations

The authorisations register says who may do which safety-critical work, where and until when: Authorised Person, permit issuer, confined space entry and the rest. Each rests on a checked certificate and, where the kind says, a current competence.

authorisation fail closed

An authorisation counts only when it is current, in date, for the site, and its certificate is checked and in date. Anything missing, expired, suspended or unreadable means no: a site with no in-date holder has nobody who can do that work there.

authorisation appoint

Authorisations are appointed one person at a time, with a certificate, an expiry and a reason. Nobody appoints themselves, and Athena never appoints, suspends or revokes anyone. A suspension counts from the next check.

authorisation reminders

Thirty days before an authorisation runs out, the holder, their manager and the safety leads get a card on their Today, and again once it has run out.

timesheet

Your week is written from what was recorded: your check-ins, or on a day without one your job hours, your approved leave, your on-call and, on a day with nothing else, your published shift. Every block says where it came from.

timesheet confirm

Confirm is the one word for agreeing your own hours, and only you can confirm your week. After that a block never changes: a correction is a new block, and your manager approves the week or sends it back with a question.

check in

Check in on your phone when you start and check out when you stop. A week cannot be confirmed while you are still checked in.

inductions

Each site can have its induction: who must take it (everyone, staff or contractors), what it says one screen at a time, the words each person signs, and how many months it lasts. Publishing a new version asks everyone again; the earlier version stays good for its grace days.

induction records

A person takes an induction on their phone and signs for it, or the person who gave it records it in person or after a phone call. Each record keeps the version and exactly what they were shown. Athena can draft an induction; it never records one as taken.

hard gates

A job does not start, a permit is not accepted and “I’m here” is not recorded at a site until the person has the site’s induction in date, and for a job the skills its trade needs. The reason is said in words. Nothing needed means nothing missing.

gate bypass

A supervisor can let one person past the job or site gate once, at one site and for a few hours, with the reason and what was missing recorded. A permit gate, a missing authorisation and an unknown person are never bypassed, and nobody bypasses for themselves.

gate soft

In People settings the job and site gates can be soft: the person is warned and goes on. Accepting a permit is always a hard gate.

induction quiz

An induction can end with a few check questions and a pass mark. The questions and right answers are part of the version, so changing them is a new version. Not passed, nothing is recorded and the person is told which questions to read again; passed, the answers and the score are kept on their record.

induction kiosk

A site’s shared screen at the gate or reception can take its induction one person after another: each reads it, answers the questions and signs with their own login for that one act. The screen stays as it was and keeps nothing of theirs; the record says it was taken on a shared screen.

time costs

An approved week is costed once onto the money ledger at each person’s own rate, else the rate for that kind of hour. Hours on a job are already on the job at the normal rate, so the week adds only their overtime or weekend premium; hours that are not on a job carry their whole cost.

pay rule

The pay rule says when overtime starts in a week and the weekend rate. Overtime falls on the last hours of the week. Without an overtime rate it is the normal rate times the multiplier. A kind of hour with no rate is left unpriced and said, never costed at nothing.

payroll file

The payroll file gives hours, not money, for each person and approved week: worked, overtime, weekend, travel, call-out and on call. Your payroll applies its own pay rates.

toil

Time off in lieu is banked from an approved week’s overtime, before the week is costed, by the person’s manager; never more than that week’s overtime. Time taken comes off the balance, which never goes below nothing.

standing rule

Your standing rule says which weeks are clean: confirmed by the person, every check passed, under the hours you set, and (unless you allow it) no lines typed by hand. Approve all clean approves those in one press and lists them; the rest wait for you to open.

hours invoices

An agency’s or contractor’s invoice for hours is matched line by line to the hours you approved for their people in that period, and to their rate card. One that does not match is approved only with a reason, or disputed.

Messages

safety alert

A safety alert or a briefing goes to the people you choose: named people, everyone in a role, or everyone who works at a site. Each person gets it in Messages, on their phone and by email, with one tap Got it.

acknowledged

For each person the alert shows when it reached them, when they opened it and when they acknowledged it, and how: from the notification, in the app, by answering, or by replying to the email. The phone’s own clock is kept beside the server’s.

not acknowledged

Someone who has not acknowledged is reminded every 30 minutes, twice at most, until the time you set. When the time passes their manager is told, once, with a card to acknowledge for them if they say they have it. Each workspace can change the wait and the number of reminders.

on behalf

If someone tells you by phone or in person that they have it, acknowledge it for them with the reason. It shows as acknowledged by you on their behalf, and it is recorded.

reply by email

Replying to the email of a safety alert or briefing puts the reply on it and counts as acknowledging it. Automatic replies, out-of-office messages and replies from another address are kept but acknowledge nothing.

safety lane

Safety alerts, briefings, their reminders and the word to a manager always come through: quiet hours, push limits and the digest never hold them, nobody can switch them off, and they never cost credits.

digest

Updates that can wait, such as who acknowledged what you sent, come as one daily digest at your time instead of a push each. Choose the time, or switch it off, in your notification settings. It never carries safety messages.

daily brief

Your daily brief arrives at your brief time: the safety alerts and briefings sent to you, word for word, what is waiting for you, and what you sent that people have not acknowledged. Each one is kept for 90 days under History.

predict drafts

Athena can draft a safety alert from an incident for you to check: you change the words and who it goes to, and you send it. Athena never sends one.

texts

Texts and WhatsApp messages go to requesters, customers and your own people from the app. Each one is in the send log with who it went to, why, what it cost in credits and whether it arrived. Safety messages never cost credits.

one voice

The app never floods anyone. Outside the organisation, a person gets at most one message a day from the app across every job; inside, at most three chases a day, and the rest wait for one bundle with their next brief. Safety and urgent messages always go. Each workspace can change both limits.

stop

Anyone who replies STOP gets no more texts or WhatsApp messages on that channel, except safety messages. START puts them back on. You can also take someone off when they ask you by phone.

athena asks

Athena can ask to send a message to someone outside the workspace, such as telling a requester their job is still in hand. It never sends one on its own: each waits for a person to approve it.

text protection

Texts only go to countries you work in, never to premium-rate or personal-number ranges, and one number gets at most five automatic texts a day.

escalations

An escalation chain pages people in order when something urgent has nobody answering: whoever is on call, then a role, then named people, each by the app and by text, with a wait between steps. When the last step runs out, the chain’s owner and the admins are told. Anyone paged can answer it; someone who looks after escalations can take it over or stop it, with the reason.

escalation test

Test a chain before you rely on it: a test run pages only you, so you can see each step arrive.

broadcasts

A broadcast sends one notice by text, WhatsApp or email to the people you choose: named people, a role, a site, or people outside the organisation who agreed to hear from you. Before it goes you see how many it reaches, who cannot be reached, and its cost in credits. Outside the organisation, or to more than 50 people, a second person approves it.

The phone app

my day

My day on the phone has chips along the top: Mine (your stops in order), Available (jobs nobody has yet), Drafts (what you started and did not send), To sign (sign-offs waiting) and Team for supervisors. Cards below show only what applies to you.

scan

Scan opens the camera and reads QR codes and barcodes on assets, places and job sheets. It opens what the tag is on and offers what fits: open it, raise a problem, take a photo or sign. If the camera is off or the tag is worn, type the code instead.

signed tags

Tags made by the workspace carry a check only it can make, so a sticker put over a real tag is spotted: the phone says it is not from your workspace and offers to report it. Anything else a code says is shown as text, never opened as a link.

scan offline

With no signal, a tag for something already on the phone opens straight away. A tag the phone does not hold yet waits and opens when there is signal.

photo

Photos taken in the app are kept in the app, never in your own photo library. Each is saved on the phone first and sent when there is signal; it only counts as sent once the server has exactly the same picture.

signature

A signature is drawn on the screen with the signer’s name and what they are signing. It is kept as evidence on the job with the time, and with where it was signed when the workspace records that.

location

When the workspace asks, the phone records where a photo or signature was taken, with how accurate the fix was. It is kept beside the evidence, never inside the picture, and never taken when you are not doing a job.

alerts

Job alerts come as notifications on the phone once you allow them. On an iPhone the app has to be on the Home Screen first. Until notifications work, new and moved jobs come to you by email instead.

permissions

The app asks for the camera, location or notifications only when you first need them, with one line saying why. If you said no, This phone shows the steps to change it, and the job carries on without it.

screen on

While a job is open the screen stays on, so it does not lock in the middle of a task. It lets go when the battery is low or you leave the job.

this phone

This phone shows what is waiting to be sent, which permissions are on, whether alerts work (with a test), the app version, and a way to save unsent work as a sealed file only support can open.

store app

The Predict & Maintain app from the App Store or Google Play is the same app as in the browser, with more: alerts that arrive like texts, face or fingerprint unlock, and opening with no signal. Nothing is bought in the app.

welcome

The first screen of the store app has three ways in: sign in, enter an invite code, or, if your organisation is new, get a link to set it up on the website. Set-up and anything to pay for happen on the website, never in the app.

pin

A PIN of at least six numbers unlocks the app on this phone when face or fingerprint cannot be used, in gloves or a mask. After too many wrong tries the phone clears its saved records; work not yet sent is kept and sent when you sign in again.

biometric

Face or fingerprint unlock opens the app on this phone only; it is not your sign-in. If the faces or fingerprints on the phone change, the app asks for your PIN once and you can turn face or fingerprint back on.

offline sign in

With no signal the app still opens, after your PIN or face or fingerprint, for as many days since it last reached the server as your organisation allows. Work done then is sent and checked when there is signal.

update

The app updates itself in the background and never in the middle of a job: it waits for the job to finish, and for unsent work to be sent when the new version needs it. With no signal it keeps working on the version it has.

privacy

What your organisation can see shows exactly what the app does on your phone: location only during a lone-worker session, an SOS or evidence your organisation asks for; photos kept in the app; no contacts or messages read; wipe removes only the app.

practice

A practice job is a real job on your phone, marked PRACTICE, that counts for nothing: try every step (travel, arrive, start, a reading, a photo, a note, a signature, complete). Only you and your supervisor see it.

app alerts

In the store app, job alerts come from the phone itself (Apple or Google notifications), so they arrive even when the app is closed. Turn them on from This phone, and send yourself a test.

rating

The app may ask once in a while, after a finished job, whether you would rate it in the store. It never asks during a safety task or on the sign-in screen.

safety alarms

In the store app your lone-worker countdown is set as alarms on the phone itself: five minutes before, when due, and when it is missed, even with the app closed. In a browser the phone cannot alert you with the browser closed, so keep the page open; the server still tells your people if you miss a check-in.

critical alerts

SOS alerts, missed check-ins and lapsed permits come through as critical alerts in the store app: they sound even with the phone on silent or Do Not Disturb, where the phone allows it.

sos no signal

No data signal when you hold SOS? It is kept and sent the moment the signal returns, and the phone offers to text the people on call straight away from its own messages app.

sos

Hold the SOS button for a second to raise an SOS. It goes at once to whoever is on call, then to the people watching your lone-worker session, by push and by text. The screen then says who has it, gives the emergency number to call, and shows where you are so you can read it out.

sos retry

With no signal the SOS is kept on the phone and goes the moment there is signal, tried again every few seconds. Send SOS by text opens your text app with the message and the numbers of the people on call already filled in.

sos where

While your SOS is live, the phone sends where you are every 30 seconds, and you can add a photo. If the phone has no location fix, the SOS still goes; it just says so.

sos cancel

Only you can cancel your own SOS, by holding Cancel for 30 seconds and then giving your PIN. If you set a duress PIN, giving it instead seems to cancel the SOS but sends a silent alarm to the people helping you.

permits

Permits on the phone are in four lanes: Mine (you are in charge or in the working party), To issue (a request waits for you), Live on my sites, and Isolations. Each shows its time left and who it waits for.

permits offline

With no signal the phone shows its last copy of a permit with the time it was checked, and says it may have changed. Nothing is signed from an old copy: issuing, accepting, resuming and handing back wait for signal, because the server checks who may sign and what clashes at that moment.

permits draft

You can draft a permit with no signal. It is kept on the phone with a number ending in OFF, such as PTW-HW-OFF-K3F9-0001, until it is requested. Request issue waits for signal, because the issuer must see the same draft; then the permit gets its real number, and the OFF number still finds it.

permits kept

With no signal, locking off a point is kept on the phone with the time you did it and goes the moment there is signal. The three prove-dead steps and your hand-back ticks are kept with their times too. Recording it proved dead, verifying or removing an isolation, handing back and every signature wait for signal.

shared offline

On a shared device you can switch in with no signal once you have had a turn on it with signal, within your organisation’s offline days. Nothing is signed in a turn begun with no signal; your work waits, kept as yours, and goes when you type your PIN again with signal.

shared device

A shared tablet or phone carries several people in turn. Tap your badge or your name, then give your PIN: everything you do is recorded as you. When you switch, lock or leave it idle, your jobs, drafts and unsent work are locked away from the next person and go when you are back.

shared pin

Your PIN for shared devices is at least 6 numbers, with no runs like 1234 and nothing repeated three times. Five wrong tries lock the PIN pad for 15 minutes. Set or change it on This phone.

shared lock

If your organisation locks a shared device on the devices page, nobody can switch in until it is unlocked. If it is wiped, the device clears every person’s records and starts again; work not yet sent is kept to be sent.

registers lookup

Look a tool or instrument up on the phone by the tag or serial on it, its register number, or by scanning its label. It shows whether it is good to use now; if it is not, it names the one in date at the same site to use instead.

registers take

Take it puts the thing in your name, and Hand it back puts it back where it is kept. A thing that is stopped, overdue or not known to be good cannot be taken.

registers certificate

Photograph a lab’s calibration certificate on the instrument’s page and it is read twice. You check what was read against the certificate, pick the result yourself, and accept it or discard it with why. It then waits for someone to approve it.

Reports

board

The KPI board shows twelve numbers for the last 30 days, each against the 30 days before. It is worked out when you open it.

dash

A dash means the number is not known: nothing was due, nothing was recorded, or the data it needs is not in the product yet. It is never shown as 0.

collecting

“Collecting” means there is not yet enough behind a number for it to mean anything, such as one failure for the time between failures. It says how many it has of how many it needs.

partial

“3 of 5 known” under a number means some of what it adds up has no value yet, such as jobs with no estimate. The number shown is what is known.

arrows

An arrow compares the number with the period before. Green is good news for that number, red is bad. No arrow is drawn when either side is not known, when the definition changed, or with fewer than 10 jobs behind a percentage or an average.

fresh

The stamp on a board says how fresh it is: Live when it was just worked out, or the time the figures were kept. From the first time anyone opens the board, each night’s figures are kept at 02:30 your time, so last month’s numbers stay as they were.

rebuilt

“Rebuilt from records” on an earlier figure means no figure was kept that night, so it was worked out from the dates on the records instead.

definitions

Every KPI has one written definition, used everywhere it is shown. A change to a definition is a new version from a date; figures kept earlier keep the version they were made with.

sites

Each site’s day starts at its own midnight, so a site in another time zone counts its own days. A day the clocks change is 23 or 25 hours long.

test data

Sample, demo, training and test records are never counted. Records brought in from an old system count in trends and are labelled.

export

Export gives what is on the screen as CSV or Excel. A number that is not known is an empty cell, not 0, and text a spreadsheet could run as a formula is kept as text.

pdf

Save a board as a PDF. Every page says what it shows and as of when.

kpis

Safety numbers shows the injury rates, days since the last lost-time injury and what is being done (near misses, observations, actions and inspections on time) over the last 12 full months, each against the 12 months before. Tap any number to see the records behind it.

kpis rates

Each site’s injury rates are per the hours its country reports on: per 200,000 hours in the US and Canada, per 1,000,000 hours elsewhere. Every rate says which. Across sites that report differently, the rate is per your own country’s basis, and each site is shown on its own.

kpis cases

A rate counts hurt or ill workers (employees, contractors and agency staff) on incidents that are not cancelled. Recordable is what a person decided when classifying the incident; an injury nobody has classified is shown on its own line and left out of the rates until someone does.

hours

Enter the hours worked at each site each month, or import them from a CSV your HR or payroll system exports, with columns for the site, the month and the hours (and the number of people if you have it). A file with a wrong line is refused whole and says which line.

hours crew

Fill from shift patterns works out a month’s hours from the crew’s shift patterns for any site nobody has entered yet. It never changes a figure someone entered or imported.

hours missing

A month with no hours entered is not counted as no hours: a rate over it says how many site-months are known, and with no hours at all it shows a dash.

dashboards

Each role has its own dashboard of at most eight numbers: your own for a technician, your team’s for a supervisor, safety for a safety lead, the plan for a planner, your sites for a manager. Every number opens the records behind it. A number your role does not see is not shown at all.

mine

Your own numbers count only what is yours: the actions you own, the near misses and observations you reported, your own training.

kpi page

A KPI’s page shows the same number as its tile, how it is worked out with the numbers in, twelve months of it, each site side by side, and the records behind it.

since

Since you started compares the last 30 days with your first 30 days, on the same definition. The first 30 days are kept once they are over and never change.

bi

Connect a BI tool makes a key your tool (Power BI, Tableau, Excel and others) uses to read the reporting tables: the same numbers the reports use, never the raw records, and only your organisation’s. The key is shown once when it is made. Revoke it and it stops at once.

coverage

What we cannot see lists what makes a number unknown or only partly known: months with no hours entered, injuries nobody has classified, reports with no site, certificates waiting for a check, jobs with no estimate. Each says where to fix it.

monthly

The monthly report is started once the month is over. It has the safety numbers first for a safety organisation, then the work, and a summary Athena writes from the numbers. A person checks the summary and signs the report off; Athena never signs or sends it.

monthly signed

Signing off locks the report: its numbers, the records behind each one and its words are kept with a fingerprint, and it can never change. To correct a signed report, make a new version; the signed one stays as it was.

monthly flags

A sentence marked red has a number that is not one of the report’s figures, or names no figure it rests on. Change it, or the report cannot be signed off.

ask

Ask Athena a question about your numbers, such as “what overran last month”. It answers only from numbers the reporting worked out, each one opening its records, and leaves out anything it could not confirm.

ask credits

Your organisation’s first question to Athena each month is included. Each one after that is a deep analysis on the price card, and the page says what it uses before you ask. The monthly report’s summary costs nothing.

client report

The monthly client report is drafted from your records for one client and one month: jobs done and open at their sites, the spares used, and the invoices you issued them. Check the commentary, sign it off and send it; it then sits in the client’s own view. A signed report never changes; building the month again makes a corrected version.

client view

A client’s view shows only what their access lets them see: their sites’ jobs, the invoices sent to them and the reports you sent. Use See their view to look at it exactly as they do.

boards

Make your own dashboard from any KPI you can see: pick the period and, if you like, one site. Each tile is worked out from the records when you open it, and opens the records behind it. A tile only ever shows what your role and your sites allow.

builder

The report builder puts KPIs and roll-ups (how many, a total, an average, the lowest or highest) over any kind of record side by side, for everything or site by site, over a period. A total with a value missing is shown as not known, never a guess.

schedules

Send a dashboard, a report or the weekly summary on a day and hour, to people here and to email addresses outside. It can wait until a figure crosses a line. It is worked out as the person who set it up, so it never sends what they could not see. Every send is in its log.

finding

Write the finding puts one sentence at the top of a dashboard or report: the biggest change against the period before, in the figure’s own numbers. Every number is checked against the records before it is kept.

weekly

Each Monday Athena writes a few sentences about last week: what moved most against the week before. Every number in them is checked against the records; when nothing is known she says so.

analyst checked

Athena’s answers about the numbers are checked twice: every number in a sentence must be one of the figures it names, and those figures are worked out again from the records before the answer is kept. A sentence that does not match is left out, and she says so.

data quality

Switch the nightly check on and the register and the documents are checked each night for what is missing or wrong. Findings close by themselves when they are put right; one that is not a problem can be dismissed with why.

Money

amounts

Amounts are kept in your workspace’s own currency, to the penny or cent, and shown the way your country writes them. An amount nobody has entered shows a dash and is listed as unpriced; it is never counted as zero.

mixed currencies

Amounts in different currencies are never added together. Until exchange rates arrive, an amount in another currency is kept as it was given and can only be approved by someone with no limit.

who

One person approves each request: someone whose approval limit covers it, never the person who asked. That rule cannot be switched off.

recheck

Pressing Approve checks your limit again at that moment, so a limit or a delegation that has changed since the request arrived counts as it is now.

predict

Athena can ask for an approval and write a short brief for the person deciding. It never approves, declines or changes a limit.

limits

An approval limit is set for a role or a named person, for one kind of decision, optionally only at some sites. It comes into force when a second person confirms it, and nobody confirms their own.

delegation

Going away? Hand your approval authority to someone for set dates and kinds of decision. It can never go above your own limit, and it is checked against your limit again each time it is used.

reasons

Declining or sending back needs a reason, so the person who asked knows what to change. Every decision is kept as it was made and cannot be edited.

codes

Tax codes start from your country’s rates, each marked to check until you confirm it. A rate change is a new code from a date: documents already issued keep the rate they were issued with.

gap free

Invoices and credit notes are numbered in order with no gaps when they are issued. Drafts have no number, and a phone without signal never shows one.

chargeable

Every job has one switch: Chargeable or not. It starts from the contract that covers the site, with the reason; planned maintenance under a contract is included. Not chargeable for any other reason needs a few words, so nobody waives a charge by accident.

rates

Your rate card has labour, labour out of hours, a call-out fee, mileage and a parts mark-up. A change starts from a date as a new version; work done before then is still priced at the old rates.

quotes

A quote can be typed or filled in from a job. Once sent, that version never changes: changing it makes a new version with its own link. The customer accepts one version, by its link or by signing on your phone on site, with their name and order number.

ready to bill

Ready to bill gathers last month’s finished chargeable jobs and your contracts’ fixed fees and drafts one invoice per customer (or one per job, if that customer is billed per job). Each job and each fee period is billed once.

unpriced

A line with no price shows a dash and is counted as unpriced, never as zero. An invoice with an unpriced line cannot be issued until you give it a price.

issue

Issuing checks the invoice first: who it goes to, their order number if they need one, a price and a tax code on every line, nothing billed twice. Then it gets the next number, is emailed with a link and a PDF, and shows in the customer’s own view if they have access.

numbers

Invoices and credit notes are numbered in order with no gaps when they are issued. An issued invoice never changes: to correct one, credit it (all, some lines or an amount) and bill again.

reverse charge

If a customer tells you they are not the end user, tick reverse charge on their account and their invoices use your reverse charge tax code with its wording. A code with legal wording is used only once your accountant has confirmed it.

reminder

One polite reminder goes by itself a few days after an invoice is due, unless it is paid, credited, in the customer’s pay run, or reminders are off for that customer. You can send it sooner yourself.

payments

Record a payment when it arrives and put it against one or more invoices; anything left over stays as the customer’s credit. A payment recorded wrongly is reversed, never deleted. With Xero or QuickBooks connected, invoices paid there show as paid here by themselves.

accounting

Connect Xero or QuickBooks Online and every invoice, credit note and customer you issue is sent there by itself, so nobody types it twice. Nothing in your accounts is changed by us except adding what you issued.

bank details

New bank details for your invoices wait for a second person to confirm them, and print only 24 hours after that. Everyone who handles money can see that they changed.

budgets

A budget is one figure for a site or a cost centre for the year, with a bar of what is spent and the day it will run out at this year’s pace. The forecast is shown as a forecast; it is never added to what is spent.

contracts

A contract holds the customer, the dates, the sites it covers, its fixed fee and whether reactive work is included. Its fee is billed from Ready to bill every period, in advance or in arrears, with a part period worked out by days.

client view

A customer whose people you let in sees the invoices you issued them, what is still to pay, and the reports you sent, through their own access and nothing else. Your rates, costs and notes are never in it.

athena

Athena can prepare quotes and draft invoices. A person sends every quote and issues every invoice; Athena never accepts a quote, issues a credit note, records or approves a payment, or changes a rate, a budget or bank details.

customer pos

Add each purchase order a customer gives you, with what it is for and how much it covers before tax. What is used is worked out from the invoices that name it; drafts count too, so two invoices never use the same money.

po checks

An invoice above what is left on its PO, or after the PO has ended, is stopped before it goes, with the amount in words. A person with the right to can let one through with a reason. At 80% used you are told, so you can ask for more in time.

po uplift

Ask for more on a PO sends the customer a short email with the amount needed and what it is for. It is sent once you press it.

accounts both ways

Issued invoices, credit notes and customers go to your accounting system, and what is paid there comes back here. Changes made there, like a voided invoice or a new contact email, are listed for you to settle; nothing here changes by itself.

accounts matching

Match each of your tax codes and kinds of cost to your accounting system’s own. Once you match one, every invoice waits until all its codes are matched, so nothing lands in the wrong place.

close

Close a month when its work is billed, its drafts issued and everything has reached your accounting system. Its costs then go there as one journal, and no more costs can be put in that month. Reopening needs a second person and a reason.

approval before issue

Switch on “a draft invoice is approved by a second person before it is issued” in Money settings and every draft waits for someone else’s Approve before Issue works; the approver never issues it themselves. Any change to the lines takes the approval off.

holds and references

Hold a draft with a reason and it is not issued until a person releases it. Each invoice line can carry the customer’s own reference (their order line, cost code or site), printed beside the line.

disputes

When a customer disputes an invoice, record it with their reason: the reminder and the chasing notices stop until a person settles it as withdrawn, credited or paid. Crediting is still a credit note a person issues.

write off

What is still owed on an invoice can be written off with a reason by someone other than the person who issued it. A written-off invoice is never chased or owed again; the amount shows on the month’s controls review.

statements

Send a statement from a customer’s page: what is open and overdue, and what they paid in the last 90 days, to their invoices address. Athena may ask to send one; you press it.

dunning

After the one polite reminder, three more notices can go by themselves at the days you set (second reminder, third reminder, final notice), each once, never while a dispute is open or the invoice is in the customer’s pay run. Switch it on in Money settings; a person can send the next notice any time an invoice is overdue.

controls review

The month’s controls review on Close a month counts what a reviewer asks about: invoices issued without an approval while the rule is on, approved and issued by the same person, billed past a PO, written off, credited, in dispute, payments reversed and months reopened.

biller

Each morning Athena drafts last month’s invoice for each customer with work ready, and drafts a request for more on a PO that will not cover it. You check and press each one. Athena never issues an invoice.

accruals

At the end of a month, press Propose on the close page and the app lists what was received on an order with no bill yet, and contractor work accepted with no bill yet, with the order or the work as evidence. Accept each one, change its amount and say why, or turn it down. An accepted one goes on the last day of the month and comes off on the first day of the next, so the real bill lands without counting twice.

stock cut off

When a month is closed the value of each store is kept as it was that day. A stock movement from a phone that syncs after its month is closed is counted in the open month, and the close page says how many and which month they belong to. Nothing is lost.

po reading

Photograph or upload a customer’s purchase order and Athena reads it twice: its number, dates, value and what it covers. Anything the two reads disagree on is marked for you to type. You check it and add it as the customer’s PO; Athena never adds or changes a PO, approves an invoice or records a payment.

po reading page

On Customer POs, press Read their PO document, choose the customer and take a photo or pick the PDF. When Athena has read it, only the values both reads agreed on are filled in; type the rest from the document, then press Add the PO. If the PO has writing that tries to give instructions, you see it as a warning: nothing is done because of it. Put it aside if it is not wanted.

Module 23

table

Capital shows ten years of needs by year with what each year adds up to. A need with no estimate is counted but not priced, so a year with one says "at least". Equipment with no install date or expected life is said, never guessed.

from register

Fill from the register makes one need for each piece of equipment whose replacement year falls in the next ten years: its last condition assessment first, else installed plus its expected life, brought forward when its condition is D or E. Equipment that already has a need is left alone.

move

Move a need to another year with why. The year the register gave is kept beside it, so you can always see where it started.

risk

A need’s risk is its condition (A good to E very poor) times its criticality (very low to very high), from 1 to 25. Without both it is "not known", never low.

create

Start a project from a sentence such as "Replace the chillers at Victoria House this summer": the site, the dates and the kind are read from it, and the template gives the tasks, milestones and handover checklist. Change anything before you make it.

snags

Anyone at the site can raise a snag with a photo. It goes to one of your people or to a company; a company gets a link that works for 30 days without signing in. Someone who did not fix it verifies it, or sends it back with why.

handover

Accept the handover when every check is ticked and the snags are verified (or accept with them open and say why). New equipment goes into the register and old equipment comes out of service by the register’s own steps, and the project moves into its defects period.

close

Close a project when its defects period is over and every snag is verified. Closing and reopening are a person’s act; reopening keeps why.

money

A project’s money is its budget lines: the original figure, approved changes, what is committed on orders not yet billed, what is actually spent on the ledger, the forecast to complete and the estimate at completion. A job’s costs count on the line its task names; costs on no line are shown as not allocated, never dropped.

changes

A change to a project’s budget is raised by one person and approved by another. When your workspace has set approval limits, the approver needs a limit that covers the amount. A change can draw on contingency, and contingency left is always shown.

scenarios

A scenario puts the money you expect each year against the needs. Statutory needs stay in their year; the rest are funded highest risk for the money first, moved to a later year when theirs is full, or left unfunded and said. A need with no estimate is never funded by guess. Adopting a scenario is a person’s act: the needs move and are approved.

valuations

A valuation says how much work is done to date. Retention is held at its percentage, what was certified before is taken off, and what is due now is worked out. Someone who did not draft it certifies it.

retention

Retention held is the last certified valuation’s, less what has been released. It is released at practical completion, at the end of the defects period, or by hand with why, and never more than is held.

cash flow

Cash flow shows what was spent each month (the ledger on the project’s jobs and its own costs) and spreads what is left of the budget over the months to the end date. With no end date it says so, rather than guessing.

rounds

A budget round is a year’s capital envelope. Bids name the needs they fund and the money asked; someone who did not make the bid funds, defers or refuses it, and funding never goes past what is left in the envelope.

risk appetite

The risk appetite is the highest risk your organisation lives with unfunded. A need above it that is not funded waits for a named person to accept the risk, until a year, with why.

survey reader

File a condition survey line by line and Athena reads each line into a proposed need: what, the kind, the year and the cost when the line says them, and what it could not find. Nothing is added until you add it.

handover builder

The handover checklist can be filled from the project: the usual papers (manuals, drawings, certificates, warranties, training) and a line for each piece of equipment the project brings in or takes out. You add each one.

Module 24

bills

Photograph or upload a utility bill and Athena reads it twice, with two different models. A figure is filled in only when both reads give the same; anything they disagree on is left for you to type.

accept

A bill counts in your energy use and carbon only when a person accepts it. Athena never accepts a bill, and never changes a figure you typed.

checks

Every bill is checked before it is accepted: that it adds up, that it is not billed twice, that it does not overlap or leave a gap with the last bill on the supply, that the units times the unit rate and the standing charge come to the net, and whether the read was estimated. A failed check needs a reason before the bill is accepted.

supplies

A supply is one meter point at a site: electricity, gas, heating oil, LPG or water, with its number as the supplier writes it. Add each supply once; bills are matched to it by that number.

carbon method

Scope 1 is gas, heating oil and LPG burned on site; scope 2 is grid electricity, location-based. Each accepted bill gives one line: the units used times the published factor for that fuel, country and year. A bill that spans two years is shared between them by days. Market-based scope 2 and scope 3 come later.

factors

Emission factors come from published tables: the UK government’s conversion factors and the US EPA’s factors. Every figure shows its publisher, table and year, and is marked check until someone compares it with the published table. When a year’s table is not loaded yet, the last one stands in and the figure says provisional.

credits

Reading a bill uses credits: one bill read twice, the same as reading a certificate.

interval

Interval data is a supply’s use every half-hour (or 15 minutes, or hour), from a meter data feed or a file you import. A missing interval is shown as a gap, never filled in; an estimate from the provider is marked as one.

interval consent

A meter’s data feed is connected by a person, with the consent it rests on: who agreed, how, and until when. When the consent ends, nothing more is read until a person records the new date.

interval import

Import a file with one reading per line (time, kWh, and A or E), or one day per line (the date, then each half-hour). Days are read in the site’s time zone: the day the clocks go forward has 46 half-hours and the day they go back has 50. Any line that cannot be read is listed with why.

interval profile

From the half-hours we work out the night-time use (01:00 to 05:00), the peak, how even the use is, how much is outside 07:00 to 19:00 on weekdays, and weekdays against weekends. Night-time use rising by a fifth on the four weeks before is pointed out: something is usually being left on.

interval measured

A measured reading is never replaced by an estimate. An estimate gives way to the measured reading when it arrives.

Module 25

home

Fleet shows which vehicles cannot go out today and why, and which MOTs, tax, insurance and services fall due in the next 30 days.

add

Add a vehicle by its registration or VIN. Where official lookups are switched on, the make, model, tax and MOT dates are filled in for you to check; otherwise type them.

unknown

A date nobody has recorded shows as Unknown, never as in date. A vehicle with an unknown or lapsed MOT, tax or insurance cannot go out until a person records it.

record

Record a renewal with its certificate or the official record. Athena never marks a date done: she reminds the person who looks after the vehicle.

off road

Take a vehicle off the road with a reason, and put it back when it is fixed. It still cannot go out while a required date has lapsed.

keeper

Every night the Expiry Keeper reminds the person who looks after each vehicle about dates due soon, lapsed or unknown and not booked, once a week until it is dealt with.

licences

A driver with no licence recorded, an expired licence or photocard, or without the category the vehicle needs, cannot be given it. Only the expiry dates and categories are kept, never the number.

telematics

Telematics brings in each vehicle’s odometer, engine hours, fault codes and machine events from the tracking provider you already use. Positions and trips are not taken.

telematics match

A tracker is matched to a vehicle by its VIN, registration or name. Athena suggests the match; a person accepts it, or picks another vehicle.

telematics verdicts

Every fault code and machine event gets a verdict: ignore, watch, inspect or stop. A red stop lamp or a fire suppression discharge is stop at once, and the person who looks after the vehicle is told.

telematics athena

Athena reads each code against the code library and says watch or inspect. She never says stop, never ignores a code she does not know, and never changes a verdict a person gave.

telematics rules

Mute a code for a vehicle, a model or the whole fleet with a reason and an end date. A red stop lamp is never muted.

Module 26

plan

A round is a walk with stops: cleaning, a patrol, readings or an operator round. Describe it in a sentence or add the stops one by one, each with what to do there: a task, a yes or no, or a reading with its limits. Say the days and times it is due and how long the window is.

proof

Each stop asks for proof: scanning its tag (grade B) or its label (C), the phone’s position near it (D), or a tap (E). Scanning a label that is not the stop’s is refused, because it shows you were somewhere else.

exceptions

A reading outside its limits, a check answered no, a task not done or a stop not visited is an exception on the run. A supervisor sends it on as a job, or closes it with why. A run with none is a clean run.

missed

A run nobody started by the end of its window and its tolerance is missed. One started and not finished an hour after that is not finished. Both show on the live board.

specs

A specification lists what is done where, how often and the time each takes. The hours a week and the cost are worked out from those, at the workspace’s normal labour rate unless the specification names its own, plus consumables. With no rate the hours are given and the cost is left unpriced.

specs agree

Link a specification to its contract and record the client’s agreement: who agreed, how and on which day. An agreed version is frozen; a change is a new version, and the agreed one stays in force until the new one is agreed.

zones

A zone is part of a site you clean or look after (offices, washrooms, a ward, the car park), with its size and the specification that covers it.

daily sheet

The daily sheet lists what the agreed specification says is due today, from how many times a week each task is done, and the rounds done and missed. A supervisor signs it, saying why anything was not done.

service failures

A performance term says what is measured (missed checkpoints, late rounds, or a figure from elsewhere), when a month fails, and the deduction. Each month is assessed by code from the rounds; a person agrees or disputes a failure.

period lock

Once Money closes a month, no daily sheet, assessment or service log is recorded into it.

service logs

Pest control visits (with whether activity was found), waste collections (stream, how much and the transfer note) and grounds tasks are logged as they were done; the waste totals add up by stream.

Module 27

home

Outages shows what is off now, what is coming in the next six months, the forced outages of the last 30 days, and where two outages clash: the same equipment or the same site over the same hours.

plan

Plan an outage for a site, the equipment it takes out, the class (window, minor, major, turnaround) and the hours in the site’s own time. It starts as proposed; a person with the right approves it, and its window then goes on the planning calendar so planned maintenance is planned around it.

forced

Record a forced outage in three answers: the equipment, when it went off and what happened. It starts with the plant off; scope and the return to service work the same way as a planned one.

calendar

The outage calendar shows every outage by site. A proposed outage can be moved freely; moving an approved one asks for a reason, which is kept. An outage that has started cannot be moved: request more time instead.

scope

The scope list holds everything the outage will do and why. Fill it from the work bank (open jobs on the equipment and planned maintenance waiting for an outage), import a spreadsheet, or add lines. Accept, reject with a reason, do it online instead, or defer it to the next outage at the site. After the outage lead freezes the scope, every new line is counted as a late addition and needs a reason.

return

Before the plant comes back, the return-to-service checklist must be complete: every permit on the equipment closed, every isolation removed, every scope line done or deferred, every A punch item closed, and the template’s own checks ticked by a person. The page names exactly what is still open.

handback

Only the operations authority named on the outage signs the handback, and only a person records the plant back in service. Athena never signs a handback and never records plant back.

ics

Subscribe to the outage calendar from Outlook or Google with the ICS feed: every outage holding its window, proposed ones shown as tentative.

availability

When an outage comes back, its window can be drafted as an exclusion against the site’s availability guarantee in Reliability, with the plant-off and plant-back times as the evidence. A person claims it.

materials

List what an outage needs, with the day it must be on site and the supplier’s lead time. The day to order by is worked out from those; a line still not got after that day is late, and one with no lead time says so rather than guess.

cost

An outage’s cost reads the money ledger for its scope jobs (actual), its open orders not yet billed (committed) and the materials still to buy at their price, against its budget. The curve shows planned spend across the window beside what has been spent so far.

turnaround import

Bring a turnaround’s jobs in from a sheet: paste or upload it with a header row (job number, name, duration, and if you have them crew, trade, area, equipment and what each job waits for, such as “A10”, “A10 SS+4” or “A11 FF”). Every link is checked; a loop is refused with the jobs in it named. Up to 20,000 jobs on one outage.

turnaround critical path

The critical path is worked out again every time you open the schedule, from the jobs and links as they stand and the progress recorded. It shows the planned finish, the forecast finish, how late that is against the window, and the chain of jobs with no float.

turnaround lookahead

The look-ahead shows the next shifts (12 hours each, from the outage start): every job due to run in each, critical ones first, whether it is ready or still waits for another job, and how many people each trade needs on that shift.

turnaround progress

Record a shift’s progress for many jobs at once: percent done and hours worked. Each reading is kept. The S-curve draws planned hours from the schedule, earned hours from the percent done, and actual hours from what people recorded.

turnaround changes

A scope change adds work, takes work off, records found work or asks for more time. When it is raised, the change to the finish is worked out from the network. A person with the right decides it; Athena never approves a scope change. Approving puts the job on the network or takes jobs off it.

kit scope

Keep stock for a scope line puts its stock materials into a kit on the line’s job in the store you choose, so nobody else takes them. The kit says how many lines are short, and each material shows as kept from stock.

call offs

A call-off asks a contractor for a crew for the outage: how many people, the days and the day rate. Its value is people times days times the rate; confirmed call-offs count as committed.

lessons

Lessons learned are kept in one library. An outage shows the lessons of its class and kind, so what went wrong last time is in front of the next one.

window series

A window series is an outage that comes round every so many months. The windows ahead are worked out from the first start, each with the outage planned in it, or marked not planned yet.

Module 28

engine

A register is a list of things you must keep track of: instruments to calibrate, ladders to inspect, keys to hand out. Each register has its own details, how often things are due and whether they are handed out. Switch on calibration, or set up one of your own.

status

The status of each thing is worked out by the system from its dates, its stops and who has it, never typed. A thing with no record is unknown, not in date. Every change of status is kept with why and who or what moved it.

holds

A stop means do not use and do not hand out. A failed calibration or an overdue one stops an instrument by the register’s own rule. Only a person clears a stop, with the reason; an overdue stop stays until the calibration is recorded and approved.

calibration

Record each calibration or lab certificate with the date and the result. Someone approves it, and for safety-critical and GxP instruments that must be someone who did not do or record it. Approving a pass sets the next due date from the instrument’s interval.

hand out

Hand a thing out to a person or a place, take it back, send it to a lab, or mark it lost or found. Who has it now comes from that record. A stopped or overdue thing cannot be handed out, but it can be sent away to be calibrated.

export

Export a register as a spreadsheet file with every value as it is kept. Reminders come when something is due soon and again when it is overdue.

reminders

When something is due soon, and again when it is overdue, the person who has it and the person who looks after it get one email each. If nobody looks after it, the register’s lead is told.

compliance

Each thing on a register with due dates also shows in Compliance, once, with the register’s own dates. It counts as done only on an approved calibration or check.

certificate reading

Add a photo or PDF of a lab’s certificate to an instrument and it is read twice. A date is taken only when both reads agree; otherwise you type it as it is on the certificate. You pick the result and accept it, and someone else approves it, or you discard it with why. Athena never accepts one.

gate

Starting a job, accepting a permit or sending an inspection with an instrument that is overdue, stopped or not known to be good is refused, naming the one in date to use instead. One limited to some uses goes through with a warning.

job tally

Where a tool control rule covers the job’s place, the job page has Start the tool tally: count the tools back for the job, and carry on with an open tally from the same place. Pick the meters and detectors you are using before you start; Start refuses one that is not in date.

tool control

Tool control says where tools must be counted back: which classes, at job or shift end, with a witness or not, and how long a tool may be out. A job there cannot close until its tally finds everything, where the rule says so. The shift-end tally opens itself at the time you set.

counts

A count lists what should be there when it starts. Scan each one, or tick it by hand and say why. It is all found only when every line is found; anything not found shows as missing, with someone, or moved while you counted. A damaged one is stopped from use. The lead is told at once when something is not found.

kits

A kit is a shadow board or toolbox: its tools from the tools register and its consumables by slot. It goes out and comes back as one. It shows complete, something missing, out, or do not use when a tool on it is stopped or overdue.

lost

Only someone with the right declares a tool or key missing. That opens its case with the steps to follow and, for a key, what it opens. Anyone who finds it marks it found on the case. A case not found is closed by a person with why; a high one, such as a master key or a high-risk tool, needs a second person. Athena never declares or closes one.

keys

Each key number says what it opens, its level, who may hold it, the longest loan and whether it may leave site. Each copy hangs in a cabinet and is handed out by the custodian. A restricted key is seen and handed out only by those allowed, never to themselves. The holder and the lead are told when a key is overdue back.

key handover

To hand a key to someone else, offer it to them and they accept it on their phone: both of you confirm. Keys you may take yourself can be taken at the kiosk.

checks

Record an inspection or a pre-use check on a tool. A pass on an inspection sets the next due date; a fail stops the tool from use until a person clears it.

leaver pack

A week before someone’s last day, they, their line manager and each register’s lead get one list of every tool, key and kit they still have, to hand back. Things handed out after that come in a new list. Nothing is moved or marked lost for them: a person does that.

key systems

A key system shows the keys from the grand master down and every lock in it. What a key opens is worked out from the locks keyed to it and to every key under it, so a lost master shows every door it puts at risk. Only people allowed restricted keys see a key system.

lock changes

Record each lock change with why, the new cylinder and the job. Recall only the copies that opened that lock. A recalled copy is destroyed in front of a witness, who is someone else.

contractor loans

To lend a key to a contractor, give the company, the person, when it comes back and any deposit, with a photo of their ID if you take one. You hold it on the register and you are chased for it. A key with a named list of holders is never lent out. Settle the deposit once the key is back.

access

Cards, fobs and phone passes are kept with the last four of their number only. Each night the list shows anyone who has left with an active card, contractors past their end date and cards not used for 90 days. Codes stay in the site vault: here you set how often each one changes and when a leaver or a finished contractor means it must.

cabinets

An electronic key cabinet is read from its maker’s system: every hook, and anything that does not match the register. A reading never moves a key on the register; you settle each difference. If the cabinet cannot be reached the page says so, never that all keys are in.

chases

When a tool or key is overdue back, Athena drafts a short chase for the person who has it. You read it, change the words if you like, and send it, or put it aside with why. Athena never sends one and never writes about a restricted key.

Module 29

keys

An API key lets one of your own systems read or change records here. You choose what it may do, from the things you can do yourself, which sites it may reach and when it expires. The key is shown once: copy it then. We keep only a fingerprint of it.

keys rotate

Rotate a key to get a new secret for it: the old one keeps working for a day (or the time you choose) so you can change your system over. Revoke stops a key at once.

keys limits

Each key may make 600 requests a minute unless you set fewer, and your whole organisation 3,000. Past that the answer is 429 with how long to wait. A key can never do more than the person who made it can do at that moment.

keys never

No key can sign anything, approve anything, close an incident, issue a permit, or change keys, people’s access or webhooks. A person does those in the app.

mcp

Your own AI assistant (Claude, Copilot or any MCP client) can read your organisation’s records through a key marked for AI agents: open work, assets, records you can see. It can only read. Whatever it reads is given to it as data, never as instructions.

webhooks

A webhook tells another system the moment something happens here, such as an incident reported or a job closed. Choose the events and the address; each delivery is signed so your system can check it came from us.

webhooks failing

If your endpoint does not answer, we try again for 72 hours, less often each time. If it still fails, the webhook is paused and its owner told. Resume it to send what was missed, or skip it.

webhooks where

Webhooks go only to https addresses on the public internet: never to a private network, never to a redirect.

connections

Connections lists everything your organisation is connected to, with a dot and a sentence for each: green is working, amber needs a look, red needs you, grey is not connected or not in use.

zapier

To connect Zapier, open Connections, choose Zapier and press Connect. You get a key, shown once, to paste into Zapier. Zaps can start from events here (a job closed, a request raised) and can raise or change records. They can only do what you chose, from what you can do yourself.

make

To connect Make, open Connections, choose Make and press Connect. Paste the key, shown once, into Make’s connection. Scenarios can watch events here and raise or change records, never more than you allowed.

power automate

For Power Automate, download our connector file from Connections and import it as a custom connector, then connect it with a key made for it. Flows start when an event happens here, checked every few minutes, and can raise or change records.

automation never

Zapier, Make and Power Automate can never sign, approve, issue or close a permit, close an incident, or change keys, webhooks or who may do what. They see only events about records the person who connected them can see.

whatsapp

WhatsApp messages go from our shared number with your organisation’s name on them. Each message uses credits, like a text. Send yourself a test from Connections, WhatsApp. Your own WhatsApp number comes later.

twilio

Texts go from our number. Each text uses credits; safety messages are free. Numbers in countries your organisation does not work in, and premium numbers, are refused. Send yourself a test from Connections, Text messages.

email

Emails go from our address. Send yourself a test from Connections, Email.

companies house

Companies House is checked when you add a UK company or sign up: the name, number and whether it is still active. It only reads the public register. If it is not connected, companies are added without the check.

not connected

“Not connected yet: it needs a key from the owner” means our own account with that provider is not set up on this system yet. Nothing of that kind is sent until it is; nothing is lost.

migrate

To move from an old system, open Connections, Move from your old system, choose the system and drop in its export files. We say what each file holds and which column is which. Assets and places go in once the counts add up and two people have confirmed them (or you confirm again a day later). You can undo it for 7 days.

migrate counts

Every row of every file is counted: in, matched to a record already here, left out with the reason, or failed with the reason. The counts must add up to the rows in the file before anything goes in. Work history, plans, parts and people files are counted now and come across in a later step.

migrate columns

A column we do not know is never dropped: it is kept on each record as an extra detail, unless you choose to skip it. Their old number is kept as the old number, so you can still search by it.

migrate amos

Two products are called AMOS: one runs a ship’s planned maintenance, the other aircraft maintenance. Choose the one you use; their files are never mixed.

agents held

Your AI agent can ask for a record to be raised or changed, but nothing happens until you confirm it in the app. Each ask waits on Held actions (and on your Needs you) for 7 days. When you confirm, it runs as you, under your own rights; when you decline, the agent is told why on its next call.

agents never

No AI agent can approve anything, sign anything, issue or close a permit, close an incident, approve an invoice, change roles, keys or connections, or delete records. There is no tool for those, so no setting can reach them.

relays

A Relay is a small program you install inside your own network to read building, plant and site systems and send the readings to us. It only ever connects out to us over HTTPS: no inbound port, nothing of ours connects in. Every driver it carries reads; it has no write function to any device.

relays pair

Make a Relay, copy its pairing code (valid 30 minutes, shown once) into the installer, and it comes online. Its device certificate rotates every 90 days. Revoke stops it at its next contact and wipes its buffer.

relays scan

A Relay scans only the ranges your OT lead has confirmed, one scan every 10 minutes, started by a person. Download the security datasheet for your OT approval board.

systems

Connect Maximo, ArcGIS, Procore, BambooHR or iTrent from its page. Name the vault entry that holds the credential (vault:name): the secret itself is never typed here. Sample mode walks the whole flow with built-in sample records and no account anywhere.

systems match

On each read, their records are linked to yours by the same serial number, the same number or the same email. A match by name alone is proposed for you to confirm. A record that matches nothing waits as an issue: link it, or leave it theirs.

systems conflict

If their system changes a record after you planned against it here, nothing is overwritten: it becomes an issue, and you choose Keep theirs or Keep ours. Keep ours holds a write back to their system for you to confirm.

coexistence

Coexistence keeps your EAM (Maximo first) as the system of record while we plan and predict on top. Choose what stays theirs, what we read and how often, and which write-backs are on. Run the dry run, read its counts, then switch write-back on. Leave coexistence later with Start the move.

hr

Your HR system is master of names, job titles, managers and employment dates. Joiners, movers and leavers come through as issues for a person: invite, link, or start the leaver flow. A leaver who still holds a permit, a lone-worker session or open work is flagged so, and is never suspended by the sync.

chat

Connect Microsoft Teams or Slack, name the channels, and post from a connection. Every post leaves through the same outbound port as email and texts, so it is logged with everything else. Approve and decline buttons on a card open the app: a chat message never approves anything by itself.

systems sap oracle

SAP PM and Oracle EAM connect the same way as Maximo: we read functional locations or places, equipment, maintenance plans, orders, measuring points and catalogue codes, link them to yours by serial or number, and hold every write back (scheduled dates, confirmations, measurement readings, notifications for predicted failures) for a person to confirm. A record changed in their system after you planned against it becomes an issue: keep theirs or keep ours. Sample mode walks it all with built-in records.

Admin and security

roles

Every workspace starts with ten roles: Owner, Admin, Planner, Supervisor, Technician, Storekeeper, Finance, Requester, Viewer and Safety lead. You can make your own, from nothing or as a copy of another role, all of it or one section.

roles advanced

In Advanced, each thing a role can do is Allow, Deny or Off. Deny always wins, even over another role that allows it. Families such as “everything in work” never include security or safety-critical acts: those are given one by one.

roles no escalation

Nobody can give what they do not hold themselves, so a role can never be made to reach further than the person changing it. Only an Owner makes an Admin or changes what Admins can do, and the Owner role always holds everything.

roles own

You cannot change a role you hold or your own roles; another administrator does it. A workspace always keeps at least one Owner.

roles plan

Something your plan does not include cannot be given to a role. Features that are coming later show when they arrive and are never switched on early.

settings

Every setting is one sentence with a value. Each module’s settings are in Settings under its own name, and the search finds any setting by what it does. Changes are recorded with who made them and why.

audit

The audit trail records every change in the workspace, by anyone and anything, with who, when, what and how. Each entry is chained to the one before, so a changed or missing entry is found by Verify.

audit verify

Verify recomputes the whole chain from the first entry and says whether it is whole, or where it breaks. Each check is itself recorded.

support

Predict & Maintain support can look inside your organisation only when you let them: ask each time (the default), never, or read-only without asking until a date you choose. Every look is recorded here and in the audit trail.

support session

A support session has a reason and an end time, at most three days. Support can look but not change anything, and can never sign, approve or issue anything. You can end a session at any time.

brain pause

Pause Athena stops every Athena job from acting at its next step: jobs only watch until you resume. One job can be paused on its own. A reason is always asked for.

plan features

Plan shows each feature as Included, Not in your plan, or Coming in a given quarter. Nothing is shown as included before it exists.

support cases

Ask us for help from Help in the app. Each case gets a number, a severity and the time we promised to answer by; you see our replies under Your support cases and can add to a case at any time.

support urgent

If SOS, lone-worker checks, permits or isolations stop working, use Urgent: a safety function is not working. It asks which one and a number to call back, and goes straight to the person on call. A person answers within 1 hour, 08:00 to 20:00 UK time, every day. We are a small team. An urgent case that reaches us between 20:00 and 08:00 UK time is answered from 08:00. When a second person shares the on-call, these hours grow, and this page says so on the day.

support reopen

When we mark a case fixed, confirm it or tell us it is not. A closed case can be reopened for 14 days.

support who sees

You see the cases you raised. Owners and Admins see every case of the organisation. Our internal notes are never shown in the app.

two step

Two-step verification asks for a six-digit code from an authenticator app as well as the password. Owners and Admins must use it, and so must anyone who approves money, signs safety records, makes API keys or exports data. Each person gets 7 days to turn it on once it is asked of them.

two step after grace

After the grace, an Owner or Admin without two-step can only turn it on; anyone else can do everything except the sensitive things until they do. Turning it on takes a minute in Settings, Two-step verification.

sign in history

The security page lists every sign-in by your members: who, when, how, from which country and on what kind of device, including failed tries. It is kept for 12 months unless you choose otherwise.

home needs you

Admin home lists what needs an administrator, worst first, at most 7 at a time, each with one button to the page that fixes it. It is checked every night and after any admin change. A finding can be set aside for up to 90 days with a reason, except a payment problem or a broken audit trail.

export

Export everything gives you every record you keep here as JSON and CSV files in one ZIP, with a list of every file and its fingerprint, the published schema, and the audit trail with its chain. It is free, whenever you want. The download link works for 7 days, and every download is recorded.

dpa

The data processing agreement says how we look after the personal data your people put in. An Owner accepts it once, in the app. We give 30 days’ notice before any supplier on the sub-processor list changes.

releases

What's changing lists each release with what changes for each role, 14 days ahead. Security fixes are never put off.

billing page

Billing shows what you pay next, every invoice with its PDF, who gets the invoices and the tax details. The card and cancelling are on Stripe’s secure page, opened from the button.

audit search

Search the audit trail by date, by who or what made the change (a person, Athena, an API key, our support), by kind of record, by one record, by how it came in (web, phone, API, import) and by what happened. Save a search you use often under a name.

audit entry

Open any entry to see exactly which fields changed from what to what, its place in the chain and its fingerprint. For a change Athena made, it links to the decision and its reasons.

audit anchors

Once a day the end of your audit chain is written to storage nobody can change, not even us. Verify checks the chain and that every anchored entry still matches, so a change made later and carefully hidden is still found.

audit export

Download the audit trail as a spreadsheet, or as a file with every fingerprint and the daily anchors. The file can be checked on your own computer, without us, with the offline checker.

audit export recorded

Every download of the audit trail is itself written into the trail: who took it, which entries and the file’s fingerprint, so a copy can always be matched to its download.

audit range

Verify a range checks just the entries you choose, from the fingerprint of the entry before them. A change Athena made can be undone from its entry with Undo this change, the same way as from its decision.

devices

Devices shows every phone, tablet and computer signed in to your organisation, its app version and when it was last seen. Lock signs a lost phone out of your organisation at its next contact. Wipe also clears your organisation’s copy on it, sending anything waiting to go first.

devices guest

A contractor’s own phone shows as a guest device. Locking or wiping it only touches your organisation’s sign-in and copy: their employer’s data and other organisations on the same phone are left alone.

keys

Your organisation’s records are sealed with its own encryption key, kept wrapped by a key service and never stored in the clear. The Owner can change it for a new one; what the old key sealed still opens. When an organisation is deleted its keys are destroyed, so every copy, backups included, can never be read again.

sso connect

Sign in with your organisation lets your people use the work account your organisation already gives them. An Owner connects your provider once: for OpenID Connect the issuer, client id and secret; for SAML your provider’s metadata, with our entity id and reply address to copy into your provider.

sso test

A connection must be tested before it can be switched on: sign in through it once yourself from the sign-in page’s Test button. Any change to how it signs people in needs a new test.

sso people

Signing in through your provider never adds anyone. Only people who are already members here, with an email in one of your verified domains, can sign in this way; invite people as usual first.

sso domains

Each email domain is proved before it matches anyone by email: add the TXT record shown on the page to the domain’s DNS, press Check, then Mark verified within an hour. A domain that is only typed in matches nobody.

sso leavers

When someone signs out at your provider, or your provider signs them out, their sessions here that came through it end too. Give your provider our sign-out address from the page. Each night we can also read your provider’s directory: members it has disabled are suspended here, never deleted. An Owner who keeps their own password, and anyone in a lone-working session, stay active and are listed as disabled at your provider, still active here.

sso certificate

A SAML provider signs with a certificate that runs out. Owners get an email 30 days before, 7 days before and on the day. Paste your provider’s new metadata and test the connection again before it runs out.

sso required

You can make your provider the only way in after a grace period of up to 90 days. At least one Owner keeps their own password in case your provider is down. If nobody manages to sign in through the provider within 15 minutes of the requirement starting, it switches itself back off, the reason is shown and every Owner gets an email.

field groups

Field groups let you hide or blank out whole kinds of detail for a role or a guest: rates, costs, personal details, site access codes and root cause before sign-off. Masked shows the field empty and says it is held back; Hidden leaves it out. A person sees a group as their most open role allows, and the Owner always sees everything. It applies everywhere the record is read: the app, the API and connected tools.

scim

Provisioning (SCIM) lets your identity provider add, change and switch off members here for you. Make a token on the Provisioning page, copy it into your provider with our SCIM address, and pick the role new people get. Only people on your verified sign-in domains can be provisioned; Owners and Admins are always made by a person here.

scim leavers

When your provider switches someone off, they are suspended here and every record they made is kept. Someone working alone at that moment carries on under their supervisor and is suspended when the session ends; the Owners get an email.

scim groups

Your identity provider can send its groups too. On the Provisioning page, pick the role each group gives: people then get exactly the roles their groups give, and lose a role when they leave the group. Your provider can never choose the roles itself, a group never gives the Owner or Admin role, and a role you gave someone by hand is never taken away.

streaming

An audit stream sends every change and security event to your own security tools as it happens: pushed to your collector’s https address as JSON lines or CEF, or ready made for Microsoft Sentinel, Splunk, Elastic or a syslog relay, each delivery signed, or read by your collector from us with its own token. Only what happened and which fields changed travel, never the values. If your collector cannot be reached five times in a row the stream pauses and Owners are told; nothing is lost and it carries on from where it stopped.

regions

Your organisation’s data is kept in the region chosen when it was made: database, files, backups, search and logs. The United Kingdom region is open now; the European Union and United States regions open later. Guests who work with you work in your region. A move between regions is a job we do with your written consent.

reads

The Reads tab of the audit trail lists every time someone was shown personal details: who it was, through which door (the app, the API, a connected tool, Athena or an extension), which kind of record, how many, and which personal fields. If a role’s field groups blank out or leave out personal details, nothing was shown and nothing is listed. Search one record to see who viewed that person’s details. Owners and Admins see this tab; nobody can change or delete what is in it.

validated mode

Validated mode is for sites whose records are inspected under US FDA 21 CFR Part 11 or EU GMP Annex 11. One person proposes it and a second person confirms it. While it is on, every change to a controlled record needs a reason, nothing controlled is deleted, and every signature needs a fresh sign-in.

validated ending

Validated mode never ends quietly. When someone asks for it to end, every Owner is emailed at once and it stays on for 30 days, so it can be called off. The request and the ending are both in the audit trail.

signatures meaning

Each signature is made under a meaning, such as Reviewed or Approved, and the person sees its exact words before signing. If the words change later, past signatures keep the words they were signed under.

signatures manifest

Every signature keeps the printed name, the date and time, the meaning, and a fingerprint of the record as it was signed. The signature list and its download show all of them, with the clock the times come from.

markings

Markings are your own, such as Internal or Restricted. Each one says whether a marked record may be exported, printed, read by Athena or sent outside, and whether every read is logged. A record marked to stay inside never goes in a message to anyone outside your organisation.

golden cases

Golden cases are things you rely on, written down as checks: a role may or may not do something, a setting has a value, a marking is handled a certain way. They run against your own records before every release. If one fails, that release waits for your organisation and we are told.

validation pack

The validation pack is the evidence your quality team needs to validate the system: what it must do, how it does it, the risks, the install, operation and performance checks with our test counts and your golden case results, and the release notes.

validated athena

Athena never signs, approves, or switches validated mode on or off. Those are always a person’s.

edition

The same product runs in our cloud or on your own computers. On your own computers you can also run it with no connection to the outside world at all (air-gapped), and with Athena switched off. Settings, This edition shows which one runs here and everything that is off, with what happens instead.

edition ai off

When Athena is not in your edition, nothing is ever sent to an AI provider. Every job Athena would do is done by hand, and each page that would have shown Athena’s help says so plainly.

config code

Your setup (settings, roles, forms, fields, rules and automations) can be saved as one file to keep in your own version control, and a changed file brought back. Before anything changes you see every difference and approve it; an import adds and changes, never removes. Forms arrive as drafts to publish, and fields and rules go through the usual Builder approval.

dedicated database

An organisation can have its own database instead of sharing one. We move it with a tested runbook: every table is copied, counted and checked, then the organisation switches over. Nothing is removed from the old database until a person on our side confirms.

Setting up

what

Setup builds your system with you: a few questions, then drop in what you already have (spreadsheets, an export from your old system, a pasted list, photos of nameplates). Athena reads it, tells you what she found, asks only what she needs, and nothing is live until you switch it on.

resume

Setup saves as you go. Start on your phone and carry on on a laptop, or come back in a week: your answers and files are kept in your workspace, not on the device.

files

You can drop in any spreadsheet, CSV or Excel export, or paste a list. Workbooks with macros are read for their values and the macros never run. A password-protected file needs an unlocked copy.

personal

From a staff list Athena takes names, roles and work contacts only. Home addresses, dates of birth, bank details, pay and health details are left in the file and never used to build your system.

found

What I found shows each file in a sentence with what was counted in it, how the files agree with each other, and a few questions where they disagree. Every number comes from the files themselves.

question8

The last question sets how much Athena does on her own: ask first, mostly automatic, or her judgement within safe limits. Permits, isolations and safety sign-offs always need a person, and only the Owner or an Admin answers it.

decisions

Before anything is built you agree Athena’s decisions one by one: your sites, how equipment is organised, who does what, who can change the system, safety set-up and how she starts. The record keeps who agreed each one and when.

build

After GO, Athena builds the first version of your system from your answers, your files and the sector pack: sites, equipment, maintenance plans spread across the year, the legal checks, safety drafts, roles, words and settings, with a first 30 days. Nothing is live until you switch it on.

care homes

Pick residential or nursing homes and setup uses the care homes pack on top of the buildings one: hoists and slings examined every six months, nurse call, profiling beds, pressure mattresses, outlet temperatures, bed rails, window restrictors, kitchen and laundry. Every legal check is marked check until someone on our side has verified it.

change

Change anything by telling Athena, for example “We don’t maintain the lifts” or “Call them jobs, not work orders”. She shows what would change and you tap Apply. Every change is a new version you can undo.

change more

You can also add a site, add equipment, add a check of your own, say who does a plan at each site, set how often by season, take a plan out at one site, put two plans on one visit, move equipment to another site, say how much it matters, and say what role someone from your files will be invited as. Say several in one go, or “undo that”. A legal check is never made less often than the law, and taking one out asks you first. Athena cannot make anyone an Owner, an admin or a permit issuer.

switch on

Switch on puts the ticked areas live one by one and checks what was made against what you saw. Safety items go on as drafts: someone competent approves each one afterwards, because switching on is not approving. Permit issuers are granted by a person, never by Athena.

undo

For seven days you can undo an area you switched on, as long as nothing has been done against it. Once a job is completed on some equipment, that part stays; you can undo what is untouched and change the rest by telling Athena.

packs

Sector packs are the starting point: equipment kinds, maintenance plans, forms, hazards and words for your kind of place. Legal frequencies are marked check until a named person verifies them, and nothing in a pack is ever made less often than the law allows.

start again

Start again throws away the setup in progress and never touches anything already live. You type “start again” to confirm.

safety starter

Choose Safety on the first screen and setup builds a safety system: your sites with their own country rules, the inspection forms for your kind of work, the kinds of report people see on the report button, a library of task analyses and toolbox talks, and the safety numbers to watch. Nothing about equipment or planned maintenance is asked unless you choose maintenance too.

safety starter sites

In a safety setup, “What happens on your sites?” picks the forms, report kinds, task analyses and talks you get: tap to add or take away. Type a site with its country, like “Dallas DC, US”, and that site gets the right rules, words and dates.

safety starter check

The task analyses and talks from setup are starting points, not approved documents. Go through each one with the people who do the work; anything that may be set by law where you are is marked check.

switch

Bring in your old records (Set up, then Bring in your old records) takes an export from your old system or a spreadsheet: incidents with the people hurt and their actions, actions on their own, people, or training records and a training matrix. Choose the file and what it holds; Athena matches the columns (Sure or Likely, tap one to change it), shows what would go in and what is left out and why, and nothing goes in until you press Bring in. Old incidents keep their dates and their old reference, come in as history and tell nobody.

switch forms

Old forms from Word, a PDF, a photo of the paper or pasted words are read by Athena into a draft form with the same questions in their own words. Check its questions, then approve it for use, keep it as a draft, or throw it away. Nothing is in use until a person approves it, and anything on the old form that tries to give instructions is left out and shown.

switch undo

For seven days you can undo a file you brought in: everything it made is taken back, except what someone has changed since, which stays. Bringing the same file in twice adds nothing twice.

team

Invite your team (Set up, then Invite your team): type a name and a mobile number or email address, choose their role, and press Invite. An email goes straight to them; for a mobile you get their link to send from your own phone by text or WhatsApp. A link works once, for 14 days. You can send it again or take it back until they join.

team join

Someone you invite opens their link, checks the name and taps Join. A new login is signed in at once; someone who already has a login signs in as themselves first. An invitation never makes anyone an Owner.

tracker

Getting started (Set up, then Getting started) shows what is done and what is left, ticked only by what really happened: your system switched on, someone from your team signed in, the app on a phone, a job raised and closed, a first planned visit done. Nobody ticks an item by hand. You can say an item is not for you, with a reason, or snooze it.

walk

Walk round a site on your phone, room by room: say or type the room, and Athena lists what is usually there. Photograph each thing and tap what it is, or say it is not here. It works with no signal and sends when the signal comes back. Send puts it into setup, or once your system is on, onto the equipment list for that site.

handoff

Continue on your phone: on a computer, show the code and scan it with your phone’s camera. The phone signs in as you, in the same workspace, and the code works once for ten minutes. The phone asks “Is this you?” first, and the computer shows when it was used.

new

Set up something new: a site (walk round it or drop in its list), a maintenance plan, a form or a kind of job. Each one opens the same place it is built from on the Build page, so there is one way to make everything.

permit types

Permit types from your sector pack are not switched on yet. They are kept as drafts until permits arrive in the product, and who may issue each one is granted by a person, with their certificate, never by Athena.

fast lane

Got a job to do now? On the setup page, the Owner can type where it is and what needs doing, and press Start the job. The site is made (or found, if you have it already) and the job opens straight away. Setup carries on later, and switching on never makes that site twice.

demo

A personal demo is a sample company for your sector with its own login. It lasts 14 days from the first time you sign in, with the days left shown at the top. When it ends, every page shows “Your demo has ended”: Start your own workspace keeps the answers you gave, never the sample data.

demo open

To open a demo, choose your sector on the website and give your email. We make a sample company for that sector and email you a sign-in link and a six-digit code; nothing else is needed. Asking again with the same email and sector while the demo runs opens the same one. Once a demo has ended, it cannot be opened again: start your own workspace instead.

demo band

In a demo, the band at the top says how long is left, like “Your demo ends in 3 days” or “in 5 hours”. It turns amber with 3 days or fewer. Start your own goes to the sign-up and takes your answers, never the sample data. When the time is up, the app shows “Your demo has ended”.

try

Try it with your own file: drop one asset list or PPM planner on the website, check your email with the six-digit code, and see your equipment, the plans and the legal checks for your country. Names, phone numbers, emails and home addresses are hidden before anything reads it. The file is deleted after 7 days unless you sign up with the same email, and you can delete it sooner.

try signup

Sign up with the same email you checked on Try it and your file comes into setup by itself, with the names and numbers still hidden and the log of what happened to it. Only that email’s files come in, and only within their 7 days. If it cannot be brought in, your sign-up still works and you can drop the file into setup again.

try virus

When the virus check is on, a file on Try it is checked before anything of it is kept. If it finds something harmful, the file is refused and nothing of it is kept. If the check cannot be done, the file is kept and its log says it was not checked for viruses: it is never called clean.

from sketch

If you signed up from a Build mine sketch, setup starts with its answers filled in: your sector, how many sites and the kinds of equipment, each marked “From your Build mine sketch”. Check them and change anything that is wrong. Answers you have already given are never replaced, and nothing you typed on the website is followed as an instruction.

Module 32

page

Athena’s page shows what it is waiting for you to decide, what it did today and why, and anything it was stopped or stepped down from doing. It is under Admin.

why

Every decision Athena makes keeps its reasons, the checks it ran, what it could not see, how sure it was, and what happened next. Open "Why?" on any of them, from the log or from the record it is about.

asks

When Athena needs a yes first, it asks the person or role who decides, and moves the question on if nobody answers in time: to the Admins, then the Owner. Outside working hours it goes to whoever is on call. The first answer counts.

asks offline

You can answer Athena with no signal. Your answer is checked when the phone is back online; if things changed meanwhile, it is not used and you are told why.

bundles

Related questions come together: approve them all, or change some one by one and approve the rest. Safety drafts, money and anything Athena marked as unusual are always answered one at a time.

do and tell

When Athena is allowed to act and tell you, the message says what it did with Undo and Why. Undo all this caused reverses everything that followed from it that can be reversed, and names what cannot.

step down

If people change, reject or undo Athena three times or more, and more than a quarter of the time over 30 days, on the same kind of action, Athena asks more before it acts there and tells the Admins why. It never raises itself.

stop here

A supervisor or manager can stop Athena doing one job at their site, with a reason. It then only watches there until an Admin lets it act again. Safety alarms are never stopped this way.

ai off

The Owner can switch AI off for the whole organisation. Anything Athena would write or read with AI is left for a person, rules-only checks keep running, and safety alarms and messages are never affected.

outage mode

Run without Athena, during an outage, keeps everything working as a normal system: nothing is lost, and Athena picks up again when it is switched back.

credits

Reading certificates, paper forms, manuals and drawings costs credits, charged once when the reading starts and given back in full if it fails. Everyday work, and anything to do with safety messages, costs nothing. With no credits left, readings wait and nothing is lost.

quality

Athena’s quality page shows, for each job, how often people changed, rejected or undid what it did over 30 and 90 days, why, the mistakes reported, and the messages it flagged as trying to give it orders. Under 30 decisions it says too few to tell. Approvals made too fast to have been read are left out.

report mistake

If Athena got something wrong and it mattered, press Report a mistake on the decision. Say what happened and how serious it was. Athena at once asks more before it does that again; if it was Serious or Safety, it asks first on that whole job until an Admin confirms the fix.

mistake sharing

Mistakes are shared with Predict & Maintain so we can fix the cause for everyone. An Admin can stop sharing one, except a Safety mistake: we must always know about those.

injection flags

Athena checks every email, message, document and photo that comes in from outside for words trying to give it orders. A flagged message still reaches you as normal; Athena only asks first before acting on anything built from it. Safety messages are never held up. An Admin can mark a flag as not an injection.

mistake our side

When you share a mistake with us, one of our team takes it and says where it stands: Investigating, Fixed for you, Fixed for everyone (with what we changed) or Not a mistake (with why). Our replies show on the mistake. Only you can close it: confirm the fix, or say it is not fixed. A Safety mistake is taken within one working hour.

dial adviser

Athena’s trust page says, for each kind of thing it does, whether it has earned one level more freedom, should stay where it is, or should ask more. It only says "ready" after 90 days of your answers, and only when even the worst likely rate of people changing, turning down or undoing its work is under the limit. Until then it says about how many more checked decisions it needs.

dial raise

Only a person raises Athena’s dial, one level at a time, from the trust page: an Owner or Admin, signed in recently, with a reason and the name of the Owner or Admin accountable for it. Athena never raises itself. Lowering it is always allowed, and Athena lowers itself when people keep changing what it does.

dial never

Some things never go on Athena’s dial at all: issuing or cancelling a permit, approving a safety document, approving a payment, closing an incident and signing. Only a person ever does them. Messages to people outside, spending, legal and access changes are never done quietly, and anything safety-critical always waits for a yes.

monthly report

On the first of each month Athena drafts what it did last month: what it did for each job, how often people changed it, every mistake reported, what it could not see, the credits it used and what changed on its dial. An Owner or Admin checks it, can rewrite the summary, and publishes it. Time given back is an estimate, with the method shown, and never counted as money.

spot checks

Once Athena does something without asking, a person keeps checking a few of the things it did. Each Monday about 3 in 100 of last week’s are picked at random for each job, at least 5 and at most 20, from every kind of record. Mark each one right, wrong (say why) or not sure. Skipping one picks another in its place; a skipped one never counts as right. If too many are wrong, Athena goes back to asking first.

outcome checks

For each job Athena acted on, Athena looks again a day after it was due: done in time and not reopened, or late, or back again. When the records do not say, it says it does not know. Athena is not given more freedom while what happened afterwards is clearly worse than when your own people did the same work.

dial accountable leaves

Every level above Ask first names an Owner or Admin who is accountable for it. The moment that person leaves, is suspended or is no longer an Owner or Admin, the level goes back to Ask first and the Owner is asked whether to raise it again with someone new.

Changing the product

ask

Anything missing, ask Athena to add it: a new field on a form, a new choice in one of your lists, a new name for something, a shared list. She says back what she will change before anything changes, shows it on your own records, and it goes live when someone who may make that kind of change says yes.

who

Who can change the system is chosen at setup: only the Owner, the Owner and planners for small changes, or the Owner and managers. Everyone else can still ask; their ask waits for someone who may make it.

safety

A change to safety set-up needs an admin and the safety set-up approver, and nothing ever weakens a safety check, a permit step or a sign-off.

undo

Every change to the setup can be undone in one tap from the change card or Builder, Changes. Undoing hides what was added; the values already filled in are kept and come back if the change is made again.

never

Asking Athena never changes who may do what, sign-in and security, billing, the audit trail or her own rules, and never deletes records.

later

New code and new kinds of screen are not made by asking yet: Athena writes them up for the product team in your words, with the records you point to as examples, and you see the request and our reply under Builder, Requests to us.

statuses

Ask Athena for a status of your own, such as Waiting for parts: it sits under one of the product’s statuses (On hold), so everything the product does with On hold still works. A move to it can need a field filled in or a note first, and only certain roles can make it if you say so.

rules

A rule that runs by itself, such as “when a pump trips twice in a week raise a P1 and tell Dave”: Athena says it back, shows what it would have done over the last 90 days, tries it on one real record without keeping anything, and it starts once someone who may change how work runs says yes. Every run is in its log, and Undo stops it; the jobs it raised stay.

rules safe

A rule can do only what the person who approved it can do, never a sign-off, an approval or a safety step, and never sets itself off again: a rule that would is refused before it is made.

suggest

Anyone can suggest a change from any page with their own words. It waits in the list of suggestions for whoever looks after the setup, who makes it or replies.

fixit

If something will not work, say so to Athena: she checks the same rules the system checks and says which one stops it (your role, your sites, the plan, or a field the record still needs) and who can change it.

dictionary

Builder, Changes has the data dictionary: every kind of record, field, list, status and rule your workspace runs on, to download as a spreadsheet.

phone

A field you add shows on the record on the web and on the phone. A phone that has not picked up the change yet can still send its work; nothing filled in is lost.

worked out

Ask Athena for a field that works itself out, such as “add a field that totals the parts used on this job” or “add an Estimated hours field that is estimated minutes divided by 60 on jobs”. She says back what it works out in plain words. Nobody types it in; it shows a dash until what it needs is filled in.

worked out history

When a worked-out field changes, closed and signed-off records keep the value they had; only open records show the new one. The change card says how many closed records keep their old value.

links

Ask Athena to link one kind of record to another, such as “link jobs to one or more assets”. The other record then lists everything linked to it, and only people who may see those records see them in the list.

layout

Ask Athena where a field should sit: “move Door reference to the Safety fold”, “put PO number first”, “show PO number on the list only” or “keep Notes off the phone”. It moves on the same page everyone already uses; there is never a second version of the page.

approvals

Ask Athena for an approval rule, such as “purchase orders over 5,000 wait for the area manager”, or “new jobs at the depot wait for an admin”. It goes live like any big change. From then on, when someone does that, it waits under Builder, Waiting for approval until the right people say yes, and whoever asked does it from there in one tap: exactly what was asked, once.

approvals who

Whoever asked never approves their own request, a person decides once, and Athena never approves anything. An approval rule can need people one after another, all at once, any one of them, or two different people.

approvals never

Raising an SOS, checking in while working alone, reporting an incident and suspending a permit are never held for approval, whatever a rule says.

two person

Admin, Settings, Builder can turn on the two-person rule for small, medium or big changes to the setup: two different people approve each one. A safety change always needs two: an admin and the safety set-up approver.

own kinds

Ask Athena for a kind of record of your own, such as “a key register for each site”: it gets its own numbers (KEY-0001), its own statuses, its own fields, a list and a page, and phones keep it like the product’s own records.

safety rules

The safety rules (how long each permit kind lasts, the fire watch, the risk assessment words, the check-in times of working alone) can be made stricter for your workspace, never looser. A change to one needs an admin and the safety set-up approver. Athena’s Rule Adviser reads your incidents and suggests a stricter rule when two or more show one is missing something.

rule adviser button

Builder, Safety rules shows every rule as it is here and has the button Ask Athena to check our rules: she reads the last 90 days of incidents and near misses while you wait and suggests a stricter rule, or says why there is nothing. Taking a suggestion drafts a safety change for the two approvers; nothing changes until they both say yes. She also checks on the first of each month.

stricter in force

A stricter rule applies wherever the product’s own would: a longer fire watch holds a hot work hand-back until it has run, added risk assessment words bring the hazard into Athena’s drafts and the reading at submission, and added checklist lines are asked for at the signature.

own records phone

Your own kinds of record are on the phone at Records (/m/records): the lists, Add one with its own fields, and moving a record on, the same as on the desktop.

golden

When you decline or correct something Athena suggested, her Golden Set Curator may turn it into a test case, with every name, email, phone number and reference taken out. One person here accepts it and a different person confirms it before it is used.

marketplace

The marketplace has ready-made packages from us, such as warranty details on assets or client references on jobs. Install opens a change you can preview; nothing is added until someone who approves setup changes approves it, and you can roll it back like any other change.

extensions

An extension is a small program written for your organisation when a setting or a rule was not enough. Each version is checked by code, reviewed by Athena, and enabled by a person who may change big things in the setup. It runs in its own sealed box with only what that person approved: the records it may read, the actions it may take, the outside addresses it may call.

extensions shadow

A new version starts in shadow mode: it runs beside your work and writes nothing, so you can see what it would have done. Then a person widens it to a canary (a share of your sites) and then to everyone. You can go back at any time.

extensions breaker

If an extension keeps failing, runs slowly or spends too many credits, its circuit breaker pauses it, applies the fallback you chose (skip it, queue it, or block with a message) and tells the Owners. Nothing else is held up. Resume it when the cause is fixed.

extensions kill

Stop for good stops an extension within a minute, at most: every permission it had ends and nothing it would have done is done later. We can also stop an extension, or every extension on one toolkit version, from our side for security; you are told straight away and Athena prepares an update for your approval.

extensions ask

An extension that says it asks Athena can ask her a question while it runs. She answers in plain words only from the records that run read (with your field groups, so a hidden field never reaches her), names the records she relied on, and gives the answer in the shape the extension asked for, or says she cannot. She never takes or suggests an action. Anything the extension does after her answer waits for the person who enabled it, and only the actions it named for her answers are allowed at all.

Your plan and credits

partner page

A partner sees their own page from the link we send them: how many came through their link and became customers, the statement by month and each transfer to them. A new link stops the old one.

partner sign in

A partner signs in to their partner page with a code we email to the address they joined with. The code works for 10 minutes and once; a sign-in lasts 12 hours, or until they sign out.

partner statements

On the 1st of each month every partner gets an email with last month’s statement: paid invoices, what they earned, anything taken back after a refund, and what is due. Counts and amounts only, never a customer’s name.

partner clawback

If a customer is refunded within 60 days of paying, the partner’s share of that payment is taken back. A share not yet paid out simply stops counting; one already paid out shows as a line taken back, which comes off the next payout. Nothing is ever taken from the partner’s bank.

coach reply to

When your organisation’s email inbox is on, a reply to a getting-started email goes straight to that inbox, and the getting-started emails then stop.

coach stops

The getting-started emails stop for good once an email from you reaches your organisation’s inbox here, and each one stops once its step is done.

free

Free for one site, up to 3 people and 2,000 assets. No card. Contractors can keep up to 25 customer addresses with work in the last 12 months on Free.

team

Team is £29 a month for each person who plans or manages and £9 for each person who does the work. Any number of sites.

pro

Pro is £69 a month for each person who plans or manages and £19 for each person who does the work.

free people

Requesters, viewers, contractors, clients and every other guest are free, with no limit.

assets

You pay for the people. Each paid person who plans brings 2,000 assets, each who does the work 250; most teams never go over.

yearly

Paying yearly costs ten months and covers twelve.

enterprise

Enterprise starts at £2,000 a month, billed yearly.

what

Everyday work is in the price: planning, dispatch, reminders, answers, the monthly report. Credits are for the heavy jobs: reading manuals, certificates, drawings and paper, building extensions, paid messages. Safety messages never cost credits and never stop.

included

Free includes 50 credits a month. Team includes 100 for each person who plans and 25 for each who does the work; Pro 250 and 50.

card

Read a manual or long document: 1 credit per 10 pages. Read a certificate or inspection report and raise remedials: 2 credits each. Read a paper form page into a digital form: 1 credit per page. Read a drawing or schematic: 5 credits per sheet. Read a contract and pull out the terms: 5 credits up to 50 pages, then 1 per 10 pages. Import another system’s export after the first: 10 credits per 10,000 records; the first import is free. Build an extension, tested and reviewed: 50 credits each; a rebuild after a failed test is free. A deep analysis beyond the monthly one: 20 credits each. Translate a document: 1 credit per 10 pages. Nameplate and photo reads: Free up to 2,000 a month, then 1 credit per 10. A text message: 1 credit per message segment. A WhatsApp message we start: 1 credit each. A voice call: 3 credits per minute. Safety messages: Never: safety messages never cost credits and never stop.

failed payment

If a card payment fails, everything keeps working for 14 days and the Owner is told at once. Update the card in Billing before then.

read only

If it is still not paid when that time is up, your organisation becomes read-only: nothing is deleted, everyone can still see and export everything, and safety reports still go in. Paying opens it again straight away.

invoices

Every invoice and credit note is kept in Billing with its PDF. The card, cancelling and receipts are handled on Stripe’s secure pages; card details never reach us.

limits

Plan and features shows how much of each limit you use. You are told at 80%. When a limit is full only new things wait: everything you have keeps working, exports always work and safety never stops.

upgrade

The Owner chooses a plan in Settings, Plan and features. The page shows your own people, what you pay today and each month or year after, before you pay. Prices are without VAT; Stripe adds VAT where it applies. Card details are typed only on Stripe’s page.

seats

Add someone and they are charged for the rest of the billing period from that day. Take someone off and it applies at renewal: a period costs the most people you had in it. On monthly plans anyone who never signed in during the month is credited back on the next invoice, automatically.

preview

Any feature Team adds can be tried for 14 days, once, with no card. When the preview ends the feature is locked again and nothing made in it is deleted.

code

The sign-up code comes by email within a minute or two. If it does not, look in junk or spam, press Send it again, or check the address. After two tries, Talk to us and a person will help.

coming

Not live yet, with when it arrives: Requests by text, WhatsApp and phone (Q3 2027); Planning and scheduling by Athena, wall boards (Q1 2027); Forms and inspections, paper intake (Q1 2027); Compliance calendar and statutory register (Q1 2027); Documents and knowledge, Ask the manual (Q1 2027); Reporting and dashboards (Q1 2027); Incident and near-miss reporting, lone working with SOS (Q1 2027); Risk assessments and method statements (Q1 2027); Permits to work, basic: electrical, hot work and general (Q2 2027); Isolation register, work alongside other permits, switching and lock boxes (Q3 2027); Stores, parts, van stock and stock-takes (Q4 2027); Purchasing and suppliers (Q4 2027); Quotes, invoices and credit notes for your customers (Q2 2027); Xero and QuickBooks: invoices and customers pushed, paid status back (Q2 2027); Budgets and costs (Q2 2027); Contracts with service credits, settlements and recharges (Q4 2027); Webhooks and the MCP server (Q1 2027); Automations (Builder, step 2) (Q3 2027); Extensions (Builder, step 3) (Q1 2028); Live monitoring and predictions (Q1 2028); Reliability engineering: root cause, failure modes, availability (Q1 2028); Projects and capital planning (Q4 2027); Energy and sustainability (Q1 2028); Soft services, rounds and patrols (Q3 2027); Outages, shutdowns and turnarounds (Q4 2027); Calibration, tool and key control (Q4 2027); Your brand on the pages your clients see (Q2 2027); Full white label on your own domain (Q2 2028); API keys and the public API (Q1 2027); Sign in with your organisation (Q2 2027); Sandboxes (Q2 2027); Audit trail to your own systems (Q3 2027).

refer

The Owner or an Admin can make your referral code. When an organisation that joined with it pays its first invoice, it gets 1,000 credits, and so do you once you pay too. Once per organisation.

partners

Anyone can join as a referrer on the website and get a link at once. Consultants, contractors and trade bodies apply, and a person at Predict & Maintain decides. Shares are of money actually paid, never list price.

getting started

In your first two weeks you get at most one getting-started email a day and three in the first week, each about the next step you have not done yet. They stop once you have done it.

build mine

Build mine turns one sentence into a first sketch: your sites, equipment, the next 30 days, the checks we would track and a price. A clear sentence is drawn by fixed rules straight away. Only a sentence the rules cannot place is read by Athena, and she can only pick from the same lists of places and equipment: she never acts, and words that try to give her orders change nothing. Nothing is kept for a refusal; a sketch is kept 7 days.

build mine keep

Start free with this takes your sketch into sign-up. Once your workspace is made, setup starts with your sector, how many sites and the kinds of equipment already filled in, marked as from your sketch, for you to check or change. A sketch past its 7 days is simply left out and setup starts from the beginning.

pilot

A pilot is a time-boxed trial of the parts you need, with success criteria written down before it starts: free for up to 60 days, or up to 90 days for a quarter of the expected first year, credited against your first year if you carry on within 30 days of the end. Your Owner switches it on once every criterion has a target and a way of measuring it; nothing is rebuilt when you become a customer.

pilot reports

Each week Athena writes a short report on the pilot page: every success criterion against its baseline and target, with the figure from your reports, saying plainly when one is not met, and what Athena did that week. A week before the readout she drafts the readout pack; a person who runs the pilot reads it and approves it before it goes to anyone outside. She never changes a criterion, a target, a baseline or a price.

pilot send report

A weekly report stays inside your organisation until someone who runs the pilot presses Send to sponsor on the pilot page. It then goes once, by email, to the sponsor’s email on the pilot, in the report’s own words; the page says when it went and who sent it. A withdrawn report is never sent, and Athena never sends one.

shift pool

With a shift pool you pay for the most pooled people signed in at the same time on any day of the month, not for everyone by name. Only people on Field roles can be pooled; Full seats are always named. If more people are signed in at once than the slots you bought, the extra is billed for that month and the Owner is told; nobody is ever locked out. Kiosks, SOS and lone-worker check-ins never count.

enterprise

Enterprise prices are Pro seat prices with a volume band on the whole quantity: 15% off from 50 Full seats, 25% off from 200; from 1,000 seats we work the price out with you. A 2- or 3-year term fixes the price for the term and never renews into another multi-year term.

Module 35

outdoor

In bright light, choose Outdoor: black on white with thicker lines, easier to read in the sun. It is in your menu, or on your own page under "On this phone or computer", and it stays on that device.

gloves

Gloves mode makes every button bigger, with more space between them, and the words a quarter larger. Switch it on from your menu or your own page; it stays on that phone or tablet. It works with touch-screen gloves; ordinary work gloves do not work on any touch screen.

read aloud

Press Read aloud beside a job’s brief or a task to hear it in your language; press Stop to stop. Nothing is sent anywhere: your phone speaks it. Where the phone has no voice for your language, the button is not shown.

Talk to us

Use Questions at the bottom of any page and choose Talk to us. A person replies, not a bot.